Grid Connection. The plant will be connected to the grid via the proposed Carriewerloo substation (to be constructed on the site) which connects into the existing 275kV D▇▇▇▇▇▇▇▇ to Mt G▇▇▇▇▇ South transmission line (H2H) owned and operated by ElectraNet as a dedicated connection asset to supply Oz Minerals mining facilities.
Appears in 2 contracts
Sources: Funding Agreement (Vast Renewables LTD), Advancing Renewables Program Funding Agreement (Vast Renewables LTD)
Grid Connection. The plant will be connected to the grid via the proposed Carriewerloo substation (to be constructed on the site) which connects into the existing 275kV D▇▇▇▇▇▇▇▇▇ to Mt G▇▇▇▇▇▇ South transmission line (H2H) owned and operated by ElectraNet as ElectraNet. It is anticipated that the line shall be a dedicated connection asset Designated Network Asset to supply Oz Minerals mining facilitieswhich the Project will be connected.