General Emission Sources Sample Clauses

General Emission Sources 
AutoNDA by SimpleDocs

Related to General Emission Sources

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

  • High Risk Use Npcap is not designed, manufactured, or intended for use in hazardous environments requiring fail-safe performance where the failure of the software could lead directly to death, personal injury, or significant physical or environmental damage (“High Risk Activities”). Use of Npcap in High Risk Activities is not authorized.

  • Safety Orientation All employees shall be certified in Safety Orientation. Safety Orientation shall consist of three parts: PART 1 - the CODC Interactive Rights and Responsibilities course; PART 2 - the XXXX course or equivalent, and PART 3 - Employer or Owner Project Specific Training. It is the responsibility of each employee to hold current certification and maintain certification in part 1 and Part 2. The Employer or Owner shall provide to each Employee before commencing work with PART 3 - Employer or Owner Project Specific Training. Each Employee shall be on the payroll and paid while receiving PART 3 training. As a condition of employment it is the sole responsibility of each and every employee to obtain, hold and maintain all current certification(s) in any and all legislated safety training requirements (i.e. WHMIS, Fall Arrest, etc.) that are trade specific. Supporting documentation of all legislated training must be provided by the employee to the Union prior to dispatch and to the employer upon hire and may be further requested by the employer at any time during the duration of their employment. Prior to the expiration of any certification, the Employer will notify the Employee of the pending expiration and give the Employee reasonable time to renew their certification. Further, prior to arriving at site, employees shall hold current qualification(s) for the specific tasks and equipment identified in the dispatch request. If the employee has to be trained after dispatch, all costs borne by the Employer shall be reimbursed by the Training Fund. The CODC Harassment Policy and Procedures, including the provisions regarding General Harassment and as amended from time to time shall be the minimum standard of this Agreement.

  • Safety Glasses 10.3.1 Where a teacher is considered to be working in an “eye danger” area, the teacher shall receive a personal issue of standard neutral safety glasses which shall remain the property of the employer.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Employees At-Risk Through Medication Use 5.1 Employees who are taking medication which might affect their ability to undertake any kind of work safely, should advise an OH&S representative or the First Aid Officer, who will act immediately to eliminate the risks.

Time is Money Join Law Insider Premium to draft better contracts faster.