Common use of Foundations Clause in Contracts

Foundations. The minimum depth of foundations for pipeline trenches is given in relevant section of the document. Care shall be taken to avoid the interference of the foundations or any other component of the new building or structure with the foundations of adjacent buildings or structures. Suitable adjustments in the depth, location and size of foundations may have to be made depending on the site conditions. The Employer’s Representative shall accept no extra claims for such adjustments. Special attention shall be drawn to the danger of uplift being caused by a high ground water table. The foundation raft or mat shall be designed for uplift forces that are likely to be developed. Safety arrangement The activity shall include proper safety arrangement. Cost for this arrangement is deemed to be included under the respective item of works.

Appears in 4 contracts

Samples: gmdwsb.assam.gov.in, gmdwsb.assam.gov.in, gmdwsb.assam.gov.in

AutoNDA by SimpleDocs

Foundations. The minimum depth of foundations for pipeline trenches is given in relevant section of the document. Care shall be taken to avoid the interference of the foundations or any other component of the new building or structure with the foundations of adjacent buildings or structures. Suitable adjustments in the depth, location and size of foundations may have to be made depending on the site conditions. The Employer’s Representative shall accept no extra claims for such adjustments. Special attention shall be drawn to the danger of uplift being caused by a high ground water table. The foundation raft or mat shall be designed for uplift forces that are likely to be developed. Safety arrangement The activity shall include proper safety arrangement. Cost for this arrangement is deemed to be included under the respective item of works.

Appears in 2 contracts

Samples: gmdwsb.assam.gov.in, gmdwsb.assam.gov.in

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.