Common use of Foundation Studies Clause in Contracts

Foundation Studies. The Engineer shall coordinate with the State to determine the location of soil borings to be drilled along the bridge locations. The soil borings shall extend a minimum of 15 to 20 feet below the footing elevation or deeper as soil conditions warrant. Spacing of soil borings shall not exceed 300 feet. The Engineer shall provide a boring layout for the State’s review and comment. The Engineer will provide WinCore capacity charts, minimum embedment depths, LPILE parameters, and potential uplift forces for bridge and overhead sign foundations.

Appears in 1 contract

Sources: Contract for Engineering Services

Foundation Studies. The Engineer shall coordinate with the State to determine the location of soil borings to be drilled along for the bridge locationsstructures. The For bridge structures, the soil borings shall extend a minimum of 15 to 20 80 feet below the footing elevation or deeper as soil conditions warrantexisting grade. Spacing of soil borings for bridges shall not exceed 300 feet. The Engineer shall provide a boring layout for the State’s review and comment. The Engineer For estimation purposes, a total of 2 bridge borings will provide WinCore capacity charts, minimum embedment depths, LPILE parameters, and potential uplift forces for bridge and overhead sign foundationsbe drilled during a single drilling phase.

Appears in 1 contract

Sources: Contract for Engineering Services