FOUNDATION DESIGN. As part of the Tender Documents, Employer has provided to Contractor (i) a map of the Site in Appendix 8 ("Site Plan"), which inter alia outlines the area, within which the WTGs may be located (observing the requirements set out in Appen- dices 1 and 2) and (ii) a Geotechnical Survey, attached as Appendix 9 ("Geotech- nical Survey"). Contractor shall use these documents in his work under the Agreement, including when preparing drawings and instructions for the founda- tions of the WTGs. Contractor shall supply a foundation design which is specific to the Site and to the position of each of the WTGs at the Site, and which includes - in a separate ap- pendix - such drawings and instructions which may be used by the Employer when putting out for tender the contract to establish foundations for the WTGs. The foundation design must be made so as to fit the geotechnical conditions of the Site, which have been described in the Geotechnical Survey, attached as Xxxxx- xxx 9 ("Geotechnical Survey"). Further requirements related to the furnishing of the Site have been set out in Appendix 7 ("Contractor's requirements as to the Site"), e.g. requirements regard- ing access roads and turning spaces and hardstands. The placing of access roads and hardstands shall be made in due consideration of the interest in maintaining as good and effective operation of adjacent land as possible, and the Contractor is - to the extent possible and expedient – obliged to make use of already existing access roads etc. in order to minimize the establishment of new roads etc. As part of the foundation design, Contractor shall also supply drawings for such casting templates, foundation bolts and rings, which enable the Employer to have prepared such casting templates, foundation bolts and rings, as are necessary for the establishment of the foundations for each of the WTGs in accordance with the foundation design. The casting templates supplied by the Contractor shall remain the property of the Contractor and shall be returned to the Contractor, once the Project is completed. However, during the term of the Agreement, the Employer is entitled to produce foundations on the basis of the Contractor's casting template. Contractor is obliged to ensure that the foundation design, together with the WTGs, are compliant with the Danish governmental order no. 73 of 25 January 2013 on technical certification scheme for wind turbines (in Danish "Bekendtg- ørelse nr. 73 af 25. januar 2013 om teknisk cer...
AutoNDA by SimpleDocs
FOUNDATION DESIGN. The geotechnical engineering program would be contracted by CSWS consisting of soil data and foundation recommendations. Coordination - In the course of designing the foundations CSWS will have detailed knowledge of poles locations, design loads at each structure, and any other pertinent line data which affects the design.
FOUNDATION DESIGN. The proposal price for the foundation design shall be based on normal soil conditions. The final foundation design shall be determined when the geotechnical report is provided to the Contractor.
FOUNDATION DESIGN. Xxxxxx X Xxxxx will review the selected foundation systems for conformance with the recommendations of the geotechnical investigation and report.
FOUNDATION DESIGN. To finish off this tutorial we will size a square footing to support the steel column that we just designed.
FOUNDATION DESIGN. The ENGINEER shall develop the foundation design in accordance with TxDOT’s Bridge Division Geotechnical Manual and the Geotechnical Engineer’s recommendations.
FOUNDATION DESIGN. Responsibility: POWER Deliverables(s): • Foundation Plan Drawing • Foundation Detail Drawings • Foundation Calculations Prepare the Foundation Plan Drawing based on the substation Plan Drawing. Locate, with centerline dimensions and spacing, each foundation that is required for the supporting steel structures, equipment, and control building. Dimension the Foundation Plan from the substation baselines. Identify each foundation with a unique station- specific alphanumeric descriptor. Indicate the orientation and elevation for the foundations. Evaluate the structure and equipment loading requirements and design the foundations using data contained in the Geotechnical Report and Design Criteria. Determine the type of foundation to be used for each type of structure or equipment. Document all analysis and calculations. Prepare the Foundation Detail Drawing. Show the foundations required to support the substation structures, equipment, and control building. Identify each foundation with an alphanumeric descriptor. Show the dimensions, the approximate neat line volume of concrete, the anchor bolt requirements, and the type of rebar. Show a typical cross section and a plan view for each type of foundation. Show the projection and position of the anchor bolts and the arrangement of the rebar. Indicate sizes for all rebar. Assumption(s): • The 138kV Canal Transmission project is awarded to PEI. • All 138kV foundation designs will be used from the 138kV Canal Transmission project. • All 27kV equipment foundation designs will be used from the 7th Avenue North substation design. POWER will analyze the 7th Avenue North substation foundations to confirm that they are adequate for the soil conditions at the Canal substation site and modify the designs, if required. • Two (2) transformer foundations and oil containment design are included in this proposal. • One capacitor bank foundation is included in this proposal. • One 35kV RMAG breaker foundation is included in this proposal.
AutoNDA by SimpleDocs
FOUNDATION DESIGN. The foundation system selected shall be adequate to support imposed loads without excessive differential settlement or imposing undue stress within the support plant. Due consideration shall be given to the foundation conditions when planning the plant layout. Foundation design shall be consistent with good engineering practice in geothermal areas. All foundation designs shall ensure that any adjacent live services are either outside the zone of influence of the foundations or it shall be demonstrated that there will be no detrimental effect on the service. Where piled foundations are adopted to support plant over fill material, the system shall be designed to accommodate any consequences of future settlement of the fill material. Appropriate flexibility shall be provided in services and pipework which traverses the interface between rigidly founded structures and surrounding fill that may be susceptible to settlement.

Related to FOUNDATION DESIGN

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services.

  • Study Design This includes a discussion of the evaluation design employed including research questions and hypotheses; type of study design; impacted populations and stakeholders; data sources; and data collection; analysis techniques, including controls or adjustments for differences in comparison groups, controls for other interventions in the State and any sensitivity analyses, and limitations of the study.

  • Final Design A.4.1. Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Plan Design The flexible benefits plan is a cafeteria-style benefits program wherein the County makes a contribution toward the Flexible Benefits Plan for each eligible employee to be allocated during the employee's active employment. The County contribution is distributed by the employee among the menu of benefit options listed below, the specific details and administration of which are set forth in the plan brochures: "Core" Benefits: • Health insurance • County basic life and AD&D insurance Optional Benefits: • Dental insurance • Vision insurance • Supplemental life insurance • Supplemental accidental death and dismemberment insurance (AD&D) • Flexible spending accounts for pre-tax reimbursement of qualified medical and/or dependent day care expenses. Account credits must be used during the plan year in which they are earned for expenses incurred during the same plan year. • The plan may be modified upon written notice by the County. This plan includes for eligible employees pre-tax contributions for all monies paid toward health, dental, vision and/or voluntary AD&D plans.

  • Program Design The County Human Resources Department will operate a Catastrophic Leave Bank which is designed to assist any County employee who has exhausted all paid accruals due to a serious or catastrophic illness, injury, or condition of the employee or family member. The program establishes and maintains a Countywide bank wherein any employee who wishes to contribute may authorize that a portion of his/her accrued vacation, compensatory time, holiday compensatory time or floating holiday be deducted from those account(s) and credited to the Catastrophic Leave Bank. Employees may donate hours either to a specific eligible employee or to the bank. Upon approval, credits from the Catastrophic Leave Bank may be transferred to a requesting employee's sick leave account so that employee may remain in paid status for a longer period of time, thus partially ameliorating the financial impact of the illness, injury, or condition. Catastrophic illness or injury is defined as a critical medical condition, a long-term major physical impairment or disability which manifests itself during employment.

  • ROADWAY DESIGN MISCELLANEOUS (ROADWAY) The Engineer shall provide the following services:

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall: