First Tier Allowances. A. GROUND DISTURBING ACTIVITIES AND SITE MODIFICATION, when proposed activities described below substantially conform to the original footprint and/or are performed in previously disturbed soils, including the area where the activity is staged. 1. Debris Removal a. Debris removal and collection, including removal of uprooted trees, limbs and branches from public rights of way and public areas as well as the transport and disposal of such waste to existing licensed waste facilities or landfills. This includes the temporary establishment and expansion of non- hazardous debris staging, reduction, and disposal areas at licensed transfer stations, or existing hard-topped or graveled surfaces (e.g., parking lots, roads, athletic courts) but not the creation of new or temporary access roads. b. Removal of debris from private property provided that buildings are not affected, ground disturbance is minimal and in-ground elements, such as driveways, walkways or swimming pools are left in place. c. Chipping and disposal of woody debris by broadcasting within existing rights-of-way. d. Sediment removal from man-made drainage facilities, including retention/ detention basins, ponds, ditches, and canals, in order to restore the facility to its pre-disaster condition. The sediment may be used to repair eroded banks or disposed of at an existing licensed or permitted spoil site. e. Dewatering flooded developed areas by pumping.
Appears in 1 contract
Sources: Programmatic Agreement
First Tier Allowances. A. GROUND DISTURBING ACTIVITIES AND SITE MODIFICATION, when proposed activities described below substantially conform to the original footprint and/or are performed in previously disturbed soils, including the area where the activity is staged.
1. Debris and Snow Removal
a. Debris removal and collection, including removal of snow, uprooted trees, limbs and branches from public rights of rights-of-way and public areas areas, as well as the transport and disposal of such waste to existing licensed waste facilities or landfills. This includes the temporary establishment and expansion of non- hazardous debris staging, reduction, and disposal areas at licensed transfer stations, or existing hard-topped or graveled surfaces (e.g., parking lots, roads, athletic courts) but not the creation of new or temporary access roads.
b. Removal of debris from private property provided that buildings are not affected, ground disturbance is minimal and in-ground elements, such as driveways, walkways or swimming pools are left in place.
c. Chipping and disposal of woody debris by broadcasting within existing rights-rights- of-way.way.
d. Sediment removal from man-made drainage facilities, including retention/ retention/detention basins, ponds, ditches, and canals, in order to restore the facility to its pre-disaster condition. The sediment may be used to repair eroded banks or disposed of at an existing licensed or permitted spoil site.
e. Dewatering flooded developed areas by pumping.
Appears in 1 contract
Sources: Programmatic Agreement