Facility Output Controls Sample Clauses

Facility Output Controls. Seller shall incorporate in the Facility control system features which enable Seller to, and Seller shall:
AutoNDA by SimpleDocs

Related to Facility Output Controls

  • Access Controls a. Authorized Access - DST shall have controls that are designed to maintain the logical separation such that access to systems hosting Fund Data and/or being used to provide services to Fund will uniquely identify each individual requiring access, grant access only to authorized personnel based on the principle of least privileges, and prevent unauthorized access to Fund Data.

  • Data Input Control It will be possible to retrospectively examine and establish whether and by whom Personal Data have been entered, modified or removed from SAP data processing systems. Measures: • SAP only allows authorized personnel to access Personal Data as required in the course of their duty. • SAP has implemented a logging system for input, modification and deletion, or blocking of Personal Data by SAP or its subprocessors within the Cloud Service to the extent technically possible.

  • Technical Security Controls 35 a. Workstation/Laptop encryption. All workstations and laptops that store PHI COUNTY 36 discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of 37 COUNTY either directly or temporarily must be encrypted using a FIPS 140-2 certified algorithm which 1 is 128bit or higher, such as AES. The encryption solution must be full disk unless approved by the 2 COUNTY.

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

  • Audit Controls P. Contractor agrees to an annual system security review by the County to assure that systems processing and/or storing Medi-Cal PII are secure. This includes audits and keeping records for a period of at least three (3) years. A routine procedure for system review to catch unauthorized access to Medi-Cal PII shall be established by the Contractor.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Agreement Controls In the event that any term of any of the Loan Documents other than this Agreement conflicts with any express term of this Agreement, the terms and provisions of this Agreement shall control to the extent of such conflict.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.