ENVIRONMENTAL CHARACTERIZATION AND QUALITY CONTROL Sample Clauses

ENVIRONMENTAL CHARACTERIZATION AND QUALITY CONTROL. A. Activities required by the MassDEP UST closure guidance, including soil screening, and soil sample collection will be overseen by the Engineer.
AutoNDA by SimpleDocs

Related to ENVIRONMENTAL CHARACTERIZATION AND QUALITY CONTROL

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • NMHS Governance, Safety and Quality Requirements 3.1 Participates in the maintenance of a safe work environment.

  • SMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • EMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Erosion Control Structure Maintenance During the period of this contract, Purchaser shall provide maintenance of soil erosion control structures constructed by Purchaser until they become stabilized, but not for more than 1 year after their construction. Contracting Of- ficer may agree to perform such structure maintenance under B4.218, if requested by Purchaser, subject to agreement on rates. Purchaser shall not be responsible for repair of such structures damaged by other National Forest users whose activities are not a part of Pur- chaser’s Operations.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • WARRANTY/QUALITY Unless a longer warranty is called for elsewhere in the Contract, Contractor, manufacturer, or their assigned agents shall guarantee the workmanship, product or Services performed against defective workmanship, defects or failures of materials for a minimum period of one (1) year from District’s written approval of the Work. All workmanship and merchandise must be warranted to be in compliance with applicable California energy, conservation, environmental, and educational standards.

  • Certification Regarding Termination of Contract for Non-Compliance (Tex Gov. Code 552.374)

  • Data Quality 4.1 Each party ensures that the shared Personal Data is accurate.

Time is Money Join Law Insider Premium to draft better contracts faster.