Engineer Certification Clause Samples

The Engineer Certification clause requires a qualified engineer to formally verify and attest to the completion or compliance of certain works or materials within a project. Typically, this involves the engineer inspecting the relevant work, ensuring it meets specified standards or contractual requirements, and then issuing a written certificate confirming this status. This clause serves to provide an objective, professional assessment, thereby assuring all parties that the work has been properly executed and reducing the risk of disputes over quality or completion.
Engineer Certification. See last page of Stormwater Management Permit for proper form to sign and return to the Water Quality Administrator’s office.
Engineer Certification. Prior to November 1, 2014, the company will not establish a new class or subclass of engineer’s certification covering conventional (on-board, fixed) control operations less than “train service engineer” as established by BNSF under applicable federal regulations. Changes in purely remote control operator certification are not barred by this Article.
Engineer Certification. Engineer certifies that it has not engaged in corrupt, fraudulent, or coercive practices in competing for or in executing the Agreement. For the purposes of this Paragraph:
Engineer Certification. I, , a certified Colorado professional engineer with expertise in "structural design", based upon my on-site inspection, review of plans and/or calculations submitted, or to be submitted, and my own calculations, hereby certify that the certain structure intended for use as (describe structure): located at (job site address): has been constructed in conformance with all plans and specifications there for and in conformance with all applicable building codes of Weld County. Enclosed are lists of corrections that need to be completed before the structure can comply with all applicable building codes of Weld County. Name of Engineer and/or Firm Address City State Zip Code Phone Number By Date ENGINEER SEAL I, , a heating contractor, based upon my on-site inspection, review of plans and/or calculations submitted, or to be submitted for a building permit, and my own calculations, hereby certify that the heating system for the structure intended for use as (describe structure): located at (job site address): Name of Heating Contractor Address City State Zip Code Phone Number I, , a Colorado licensed plumbing contractor, based upon my on-site inspection, review of plans and/or calculations submitted, or to be submitted for a building permit, and my own calculations, hereby certify that the plumbing system for the structure intended for use as (describe structure): located at (provide job site address): Name of Plumbing Contractor Address City State Zip Code Phone Number Plumbing Contractor License number I, , a Colorado licensed master electrician, based upon my on-site inspection, review of plans and/or calculations submitted, or to be submitted for a building permit, and my own calculations, hereby certify that the electrical system for the structure intended for use as (describe structure): located at (provide job site address): Name of Electrical Contractor Address City State Zip Code Phone Number Electrical Contractor License number Date: Person Contacted: Job Site Address: Bldg Size: Bldg Use: Parcel Number: Building Permit Number: CORRECTIONS REQUIRED: YES NO (Identify corrections on back of this form). RESIDENTIAL & UTILITY "AS-BUILT” LIFE-SAFETY INSPECTION CHECKLIST Date: Person Contacted: Job Site Address: Bldg Size: Bldg Use: Parcel Number: Building Permit Number:
Engineer Certification. The Lender shall have received a certification from an independent engineer satisfactory to the Lender that the Project has reached Mechanical Completion by satisfying the Physical Completion test specified herein Section 6.01(b).