ENGINE REFURBISHMENT Sample Clauses

ENGINE REFURBISHMENT. With respect to the Engine Refurbishment of any Engine, the performance restoration, in accordance with the Lease, of such Engine, or a module thereof, accomplished by an FAR Part 145-approved agency in accordance with the Manufacturer's work scope planning guide, including all Manufacturer-recommended reliability SBs, alert SBs and FAA ADs (to the extent required during such performance restoration shop visit and due for termination within the cyclic release period to a maximum of two years), the lesser of (A) the amount of that invoice and (B) the amount of the Engine Supplemental Rent held by Lessor in respect of that Engine at the time of removal of the Engine from the Related Airframe to which it was attached immediately prior to the restoration.
AutoNDA by SimpleDocs
ENGINE REFURBISHMENT with respect to any Engine Basic Shop Visit (excluding controls, accessories and QEC repair/overhaul), the lesser of (i) the amount of such invoice and (ii) the balance of Engine Maintenance Reserves held by Lessor in respect of the Engine at the time of payment; and

Related to ENGINE REFURBISHMENT

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Maintenance & Repairs 5.1 Lessee shall at all times be responsible for maintaining at its own expense the leased premises in a clean, orderly and safety condition, except as hereinafter provided. Lessee shall be responsible, at its own expense, to clean and maintain all trade fixtures, machinery and equipment furnished by Lessee within the leased premises. Lessee shall be responsible to deposit normal office waste and rubbish at a location at the Central School as designated by Lessor.

  • Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.

  • MAINTENANCE & REPAIR Tenant agrees that if there is any delay in maintenance or repairs for reasons beyond Landlord's control, this shall have no effect on Tenant's obligations under this lease.

  • Maintenance Repairs and Alterations 6.01 Tenant's Obligations to Repair ------------------------------ Tenant shall at its sole cost and expense, maintain in clean and safe condition, and make all repairs and replacements to the Premises and every part thereof, structural and non-structural, so as to keep, maintain and preserve the Premises in first class condition and repair, including, without limitation, the roof, the foundation, the heating, ventilation and air conditioning system ("HVAC"), elevators, if any, all plumbing and sewage facilities, fire sprinklers, electrical and lighting facilities, systems, appliances, and equipment within the Premises, fixtures, interior and exterior walls, floors, ceilings, windows, doors, entrances, all interior and exterior glass (including plate glass), and skylights located within the Premises, and all sidewalks, service areas, parking areas and landscaping comprising part of the Premises. All repairs and replacements required to be made by Tenant shall be made promptly with new materials of like kind and quality to those used in the original construction of the Premises. If the repair or replacement work affects the structural parts of the Premises, or if the estimated cost of any item or repair or replacement exceeds $10,000, then Tenant shall first obtain Landlord's written approval of the scope of work, plans therefor, and materials to be used. Any such work shall be performed by Landlord's contractor or by such contractor as Tenant may choose from an approved list to be submitted by Landlord. Landlord shall have the right to make any repairs or replacements which are not promptly made by Tenant and charge Tenant, as Additional Rent, for the cost thereof together with interest thereon at the Agreed Rate from the date of payment thereof by Landlord. Without limiting any of Tenant's obligations hereunder, during the Lease Term Tenant, at its expense, shall obtain and keep in force an HVAC service contract and a roof maintenance program satisfactory to Landlord. Tenant hereby waives the benefit of any statute now or hereafter in effect which would otherwise afford Tenant the right to make repairs at Landlord's expense or to terminate this Lease because of Landlord's failure to keep the Premises in good condition, order and repair. Tenant specifically waives all rights it may have under Sections 1932(1), 1941 and 1942 of the California Civil Code, and any similar or successor statute or law. Notwithstanding anything to the contrary contained herein, Landlord shall exercise its rights under any guaranties or warranties relating to the original construction of the Premises if the need to make repairs arises due to a defect therein; provided, however, Landlord shall not have any liability or be required to expend any funds if such guaranties or warranties are not honored by the makers hereof.

  • Construction Contract; Cost Budget Prior to execution of a construction contract, Tenant shall submit a copy of the proposed contract with the Contractor for the construction of the Tenant Improvements, including the general conditions with Contractor (the “Contract”) to Landlord for its approval, which approval shall not be unreasonably withheld, conditioned or delayed. Following execution of the Contract and prior to commencement of construction, Tenant shall provide Landlord with a fully executed copy of the Contract for Landlord’s records. Prior to the commencement of the construction of the Tenant Improvements, and after Tenant has accepted all bids and proposals for the Tenant Improvements, Tenant shall provide Landlord with a detailed breakdown, by trade, for all of Tenant’s Agents, of the final estimated costs to be incurred or which have been incurred in connection with the design and construction of the Tenant Improvements to be performed by or at the direction of Tenant or the Contractor (the “Construction Budget”), which costs shall include, but not be limited to, the costs of the Architect’s and Engineers’ fees and the Landlord Coordination Fee. The amount, if any, by which the total costs set forth in the Construction Budget exceed the amount of the Tenant Improvement Allowance is referred to herein as the “Over Allowance Amount”. In the event that an Over-Allowance Amount exists, then prior to the commencement of construction of the Tenant Improvements, Tenant shall supply Landlord with cash in an amount equal to the Over-Allowance Amount. The Over-Allowance Amount shall be disbursed by Landlord prior to the disbursement of any of the then remaining portion of the Tenant Improvement Allowance, and such disbursement shall be pursuant to the same procedure as the Tenant Improvement Allowance. In the event that, after the total costs set forth in the Construction Budget have been delivered by Tenant to Landlord, the costs relating to the design and construction of the Tenant Improvements shall change, any additional costs for such design and construction in excess of the total costs set forth in the Construction Budget shall be added to the Over-Allowance Amount and the total costs set forth in the Construction Budget, and such additional costs shall be paid by Tenant to Landlord immediately as an addition to the Over-Allowance Amount or at Landlord’s option, Tenant shall make payments for such additional costs out of its own funds, but Tenant shall continue to provide Landlord with the documents described in items (i), (ii), (iii) and (iv) of Section 2.2.2.1 of this Tenant Work Letter, above, for Landlord’s approval, prior to Tenant paying such costs. All Tenant Improvements paid for by the Over-Allowance Amount shall be deemed Landlord’s property under the terms of the Lease.

  • Construction of the Tenant Improvements Construction or installation of the Tenant Improvements shall be performed by a licensed general contractor or contractors selected by Tenant and approved by Landlord, such approval not to be unreasonably withheld or delayed (the “Tenant’s Contractor,” whether one or more), pursuant to a written construction contract negotiated and entered into by and between the Tenant’s Contractor and Tenant and approved by Landlord. Each such contract shall (i) obligate Tenant’s Contractor to comply with all reasonable rules and regulations of Landlord relating to construction activities in the Building, (ii) name Landlord as an additional indemnitee under the provisions of the contract whereby the Tenant’s Contractor holds Tenant harmless from and against any and all claims, damages, losses, liabilities and expenses arising out of or resulting from the performance of such work, (iii) name Landlord as a beneficiary of (and a party entitled to enforce) all of the warranties of the Tenant’s Contractor with respect to the work performed thereunder and the obligation of the Tenant’s Contractor to replace defective materials and correct defective workmanship for a period of not less than one (1) year following final completion of the work under such contract, (iv) evidence the agreement of the Tenant’s Contractor that the provisions of the Lease shall control over the provisions of the contract with respect to distribution or use of insurance proceeds, in the event of a casualty during construction, and (v) evidence the waiver and release by the Tenant’s Contractor of any lien or right to assert a lien on all or any portion of the fee estate of Landlord in and to the Building as a result of the work performed or to be performed thereunder (and obligating the Tenant’s Contractor to include a substantially similar release and waiver provision in all subcontracts and purchase orders entered under or pursuant to the contract). Notwithstanding anything to the contrary, union labor shall not be required to be used for construction of the Tenant Improvements; provided, however, Landlord shall be permitted to withhold its consent to a contractor proposed to be utilized by Tenant to the extent such contractor would create a labor dispute at the Building or Project that could impair or affect the Landlord’s ability to operate the Building or otherwise provide the services it is required to provide to its tenants. In the event there is any labor dispute as a result of Tenant’s contractor and such labor dispute is impairing or affecting Landlord’s ability to operate the Building or otherwise provide the services it is required to provide to its tenants, then Tenant shall immediately take such actions as may be required in order to cause such labor dispute to cease. Tenant and its contractors shall be required to comply with the constructions rules and regulations set forth Exhibit B-1 attached hereto (and the Tenant Improvement shall be required to incorporate all design elements set forth in such Exhibit B-1). Tenant acknowledges and understands that all roof penetrations involved in the construction of the Tenant Improvements must be performed by the Landlord’s Building roofing contractor. All costs, fees and expenses incurred with such contractor in performing such work shall be a cost of the Tenant Improvements (which such cost may be payable out of the Landlord’s Construction Allowance), in accordance with the provisions of this Exhibit B. Tenant or Tenant’s Contractor shall be responsible for all water, gas, electricity, sewer or other utilities used or consumed at the Premises during the construction of the Tenant Improvements. Tenant specifically agrees to carry, or cause the Tenant’s Contractor to carry, during all such times as the Tenant’s work is being performed, (a) builder’s risk completed value insurance on the Tenant Improvements, in an amount not less than the full replacement cost of the Tenant Improvements, (b) a policy of insurance covering commercial general liability, in an amount not less than One Million Dollars ($1,000,000.00), combined single limit for bodily injury and property damage per occurrence (and combined single limit coverage of $2,000,000.00 in the aggregate), and automobile liability coverage (including owned, non-owned and hired vehicles) in an amount not less than One Million Dollars ($1,000,000.00) combined single limit (each person, each accident), and endorsed to show Landlord as an additional insured, and (c) workers’ compensation insurance as required by law, endorsed to show a waiver of subrogation by the insurer to any claim the Tenant’s Contractor may have against Landlord. Tenant shall not commence construction of the Tenant Improvements until Landlord has issued to Tenant a written authorization to proceed with construction after Tenant has delivered to Landlord’s construction representative (i) certificates of the insurance policies described above, (ii) copies of all permits required for construction of the Tenant Improvements and a copy of the permitted Final Plans as approved by the appropriate governmental agency, and (iii) a copy of each signed construction contract for the Tenant Improvements (a copy of each subsequently signed contract shall be forwarded to Landlord’s construction representative without request or demand, promptly after execution thereof and prior to the performance of any work thereunder). All of the construction work shall be the responsibility of and supervised by Tenant.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • MAINTENANCE, REPAIR, AND RULES Tenant will, at Tenant’s sole expense, keep and maintain the Property in a good, clean and sanitary condition and repair during the term of this Agreement and any renewal thereof. Tenant shall be responsible to make all repairs to the Property, fixtures, appliances, and equipment therein that may have been damaged by Tenant’s misuse, waste or neglect, or that of the Tenant’s family or visitors. Tenant agrees that no painting will be done on or about the Property without the prior written consent of Landlord. Tenant shall promptly notify Landlord of any damage, defect or destruction of the Property or in the event of the failure of any of the appliances or equipment. The Landlord will use their best efforts to repair or replace any such damaged or defective areas, appliances or equipment.

  • Office Space, Equipment and Facilities Provide such office space, office equipment and office facilities as are adequate to fulfill the Adviser’s obligations hereunder.

Time is Money Join Law Insider Premium to draft better contracts faster.