ELECTRIC LIGHTS Clause Samples

The ELECTRIC LIGHTS clause establishes the responsibilities and conditions related to the provision, installation, and maintenance of electric lighting within a property or premises. Typically, this clause specifies whether the landlord or tenant is responsible for ensuring that electric lights are operational, who bears the cost of repairs or replacements, and any standards for lighting that must be met. By clearly assigning duties and expectations regarding electric lighting, the clause helps prevent disputes over maintenance obligations and ensures that the premises remain safely and adequately illuminated.
ELECTRIC LIGHTS. The Tenant shall keep all electric lights in good working order and in particular shall replace all fuses, bulbs, fluorescent tubes and starters as and when necessary.

Related to ELECTRIC LIGHTS

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges.

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • Electric Service 1. The Authority shall make available Electric Service to enable the Customer to receive the Allocation in accordance with this Agreement, Service Tariff No. WNY-2 and the Rules. 2. The Customer shall not be entitled to receive Electric Service under this Agreement for any EP and/or RP allocation unless such EP and/or RP allocation is identified in Schedule A. 3. The Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation specified in Schedule A. If Schedule C specifies a Takedown Schedule for the Allocation, the Authority will provide, and the Customer shall accept and pay for, Electric Service with respect to the Allocation in accordance with such Takedown Schedule. 4. The Authority shall provide UCAP in amounts necessary to meet the Customer’s NYISO UCAP requirements associated with the Allocation in accordance with the NYISO Tariffs. The Customer shall be responsible to pay the Authority for such UCAP in accordance with Service Tariff No. WNY-2. 5. The provision of Electric Service associated with the Allocation is an unbundled service separate from the transmission and delivery of power and energy to the Customer. The Customer acknowledges and agrees that Customer’s local electric utility, not the Authority, shall be responsible for delivering the Allocation to the Facility specified in Schedule A in accordance with the applicable Utility Tariff(s). 6. The Contract Demand for the Customer’s Allocation may be modified by the Authority if the amount of Firm Power and Firm Energy available for sale as EP or RP from the Project is modified as required to comply with any ruling, order, or decision of any regulatory or judicial body having jurisdiction, including but not limited to FERC. Any such modification will be made on a pro rata basis to all EP and RP customers, as applicable, based on the terms of such ruling, order, or decision. 7. The Contract Demand may not exceed the Allocation. 8. The Customer’s Facility must be metered by the Customer’s local electric utility in a manner satisfactory to the Authority, or another metering arrangement satisfactory to the Authority must be provided (collectively, “Metering Arrangement”). A Metering Arrangement that is not satisfactory to the Authority shall be grounds, after notice to the Customer, for the Authority to modify, withhold, suspend, or terminate Electric Service to the Customer. If a Metering Arrangement is not made to conform to the Authority’s requirements within thirty

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)