Common use of Distribution Piping Clause in Contracts

Distribution Piping. Phase 1 of the NDES distribution piping system (DPS) is designed to accommodate the higher flow rates present at full build out demand of Wesbrook Place, including the connection of existing buildings later in Phase 2. However, the construction of the DPS will be phased to match the development in Wesbrook Place, Acadia East and Block F such that the DPS will reach new buildings just as they are reaching completion. The DPS design is based on the following criteria:  DPS routing is designed to follow roadways wherever possible and to avoid Wesbrook Mall, which has many existing underground utilities,  Pipes are sized to meet projected diversified peak heating demand in the Project Plan with a supply temperature of 90oC and a return temperature of 50oC,  During off-peak periods, the outdoor air temperature reset schedule will adjust the supply temperature and flow rate of the NDES to maximize overall system efficiency,  Pipe sizes are based on a maximum head loss of 2.05 m/100 m and a maximum flow velocity of

Appears in 3 contracts

Samples: Agreement, Infrastructure Agreement, Infrastructure Agreement

AutoNDA by SimpleDocs

Distribution Piping. Phase 1 of the NDES distribution piping system (DPS) is designed to accommodate the higher flow rates present at full build out demand of Wesbrook Place, including the connection of existing buildings later in Phase 2. However, the construction of the DPS will be phased to match the development in Wesbrook Place, Acadia East and Block F such that the DPS will reach new buildings just as they are reaching completion. The DPS design is based on the following criteria: DPS routing is designed to follow roadways wherever possible and to avoid Wesbrook Mall, which has many existing underground utilities, Pipes are sized to meet projected diversified peak heating demand in the Project Plan with a supply temperature of 90oC and a return temperature of 50oC, During off-peak periods, the outdoor air temperature reset schedule will adjust the supply temperature and flow rate of the NDES to maximize overall system efficiency, Pipe sizes are based on a maximum head loss of 2.05 m/100 m and a maximum flow velocity of

Appears in 1 contract

Samples: Infrastructure Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.