Design Development Stage. 5.1. Upon engagement, the Performance Assurance Contractor, hereby referred to as “PAC”, shall review and submit comments as it relates to the Performance Assurance Program, the Design Professionals’ Design Intent and Basis of Design, prior to 60% Design Development. 5.2. The PAC shall review and submit comments to the Design Team (DT) at 95% Design Development. 5.3. The PAC shall review and submit comments to the DT at 100% Issue For Bid (IFB)/Issue For Construction (IFC). 5.4. The PAC shall review and submit comments on the Sequence of Operations (SOO) with the Control Engineer. 5.5. The PAC shall submit PAC Specifications and Performance Assurance requirements to the Design Professional (DP) for inclusion into the Project Documents. 5.6. The PAC shall create, maintain, and update a Design Issues Log on design issues related to Performance Assurance. An NMPSFA approved Issues Log Template can be found on the NMPSFA Website (▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇.▇▇▇). If the PAC desires to use their own template, it must meet or exceed the intent of the NMPSFA Approved Template and be approved by NMPSFA prior to use. 5.7. The PAC shall create an equipment list to be witnessed, verified, and documented through the Performance Assurance Program for the project. An NMPSFA approved Equipment List Template can be found on the NMPSFA Website (▇▇▇▇▇://▇▇▇/▇▇▇▇▇▇.▇▇▇). If the PAC desires to use their own template, it must meet or exceed the intent of the NMPSFA Approved Template and be approved by NMPSFA prior to use. 5.8. The PAC shall develop their Performance Assurance Plan to be maintained and updated through the Project. 5.9. The PAC shall develop a Performance Assurance Milestone Schedule. 5.10. The PAC shall develop Pre-Functional Checklists (PFC). NMPSFA approved PFC Templates can be found on the NMPSFA Website (▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇.▇▇▇). If the PAC desires to use their own template, it must meet or exceed the intent of the NMPSFA Approved Template and be approved by NMPSFA prior to use. 5.11. The PAC shall review and comment on the Test, Adjust, and Balance (TAB) testing requirements with the GC and TAB Contractor. 5.12. The PAC shall review and comment on Equipment Submittals as they pertain to the PAC’s Performance Assurance activities.
Appears in 4 contracts
Sources: Contractor Agreement, Contractor Agreement, Contractor Agreement