Common use of Deliverable Schematic Clause in Contracts

Deliverable Schematic. The Engineer shall consider the following in the analysis to optimize the design: • Efficient use of the allocated ROW • Control of Access (COA) and driveway locations • Roadway and intersection geometry • Cross Sections • Bicycle and Pedestrian design • Drainage and Hydraulic design • Stopping Sight distance • Level-of-service • Traffic and signal operations • Construction, ROW, easement, and utility costs DocuSign Envelope ID: 81680129-218F-4A62-86EE-68C3C135A630 • Construction sequencing • Traffic control during construction • Roadside safety appurtenances • Large guide signage • Environmental mitigation (For example: Noise Walls, Storm Water Best Management Practices (BMP’s), etc.) • Bridge Layouts and Clearance • Railroads (if applicable) • Interface with existing High Occupancy Vehicle (HOV) Lane, Managed Lanes, and park-and- ride facilities • Accommodation of ultimate corridor configuration. • Accommodation of future cross street expansion as described in local thoroughfare plan if applicable. • Avoidance of utility lines if feasible. • Impact of construction delays from utility relocations.

Appears in 1 contract

Sources: Contract for Engineering Services

Deliverable Schematic. The Engineer shall consider the following in the analysis to optimize the design: Efficient use of the allocated ROW Control of Access (COA) and driveway locations Roadway and intersection geometry Cross Sections Bicycle and Pedestrian design Drainage and Hydraulic design Stopping Sight distance Level-of-service Traffic and signal operations Construction, ROW, easement, and utility costs  Construction sequencing DocuSign Envelope ID: 8168012932531276-218F-4A62D54D-42BA-86EE-68C3C135A630 • Construction sequencing • B8CD-1FFE51D0946F  Traffic control during construction Roadside safety appurtenances Large guide signage Environmental mitigation (For example: Noise Walls, Storm Water Best Management Practices (BMP’s), etc.) Bridge Layouts and Clearance Railroads (if applicable) Interface with existing High Occupancy Vehicle (HOV) Lane, Managed Lanes, and park-and- ride facilities • Accommodation  Accomodation of ultimate corridor configuration. • Accommodation  Accomodation of future cross street expansion as described in local thoroughfare plan if applicable. Avoidance of utility lines if feasible. Impact of construction delays from utility relocations.

Appears in 1 contract

Sources: Contract for Engineering Services

Deliverable Schematic. The Engineer shall consider the following in the analysis to optimize the design: • Efficient use of the allocated ROW • Control of Access (COA) and driveway locations • Roadway and intersection geometry • Cross Sections • Bicycle and Pedestrian design • Drainage and Hydraulic design • Stopping Sight distance • Level-of-service • Traffic and signal operations • Construction, ROW, easement, and utility costs • Construction sequencing DocuSign Envelope ID: 81680129E7DAA847-218F-4A62BF7C-44E6-86EE-68C3C135A630 • Construction sequencing B32B-712DD5062C72 • Traffic control during construction • Roadside safety appurtenances • Large guide signage • Environmental mitigation (For example: Noise Walls, Storm Water Best Management Practices (BMP’s), etc.) • Bridge Layouts and Clearance • Railroads (if applicable) • Interface with existing High Occupancy Vehicle (HOV) Lane, Managed Lanes, and park-and- ride facilities • Accommodation Accomodation of ultimate corridor configuration. • Accommodation Accomodation of future cross street expansion as described in local thoroughfare plan if applicable. • Avoidance of utility lines if feasible. • Impact of construction delays from utility relocations.

Appears in 1 contract

Sources: Contract for Engineering Services