Cross Sections. The Engineer shall use OpenRoads to generate preliminary cross-sections every 100 feet and at culvert locations or other critical locations in conjunction with the Geometric Schematic. The Engineer shall determine earthwork volumes for use in the cost estimate and shall prepare 11”x17” sheets of the cross-sections.
Appears in 1 contract
Sources: Contract for Professional Services
Cross Sections. The Engineer shall use OpenRoads to generate preliminary cross-sections every 100 feet and at culvert locations or other critical locations based on the OpenRoads model and in conjunction with the Geometric Schematic. The Engineer shall determine earthwork volumes for use in the cost estimate and shall prepare 11”x17” cut sheets of the cross-sections.
Appears in 1 contract
Sources: Contract for Engineering Services