Cross Sections Sample Clauses

Cross Sections. The Engineer shall use Geopak to generate preliminary cross-sections every 100 feet in conjunction with the Geometric Schematic. The Engineer shall determine earthwork volumes for use in the cost estimate, and shall prepare roll plots or 11X17 sheets of the cross-sections as required.
AutoNDA by SimpleDocs
Cross Sections. The Engineer shall use Geopak to generate preliminary cross-sections every 100 feet and at culvert locations in conjunction with the Geometric Schematic. The Engineer shall determine earthwork volumes for use in the cost estimate, and shall prepare roll plots of the cross-sections. DocuSign Envelope ID: 798F7E2C-0AE6-40EE-BFB4-3AB848988972
Cross Sections. Cross sections sheets shall include the following information at a minimum for roadways, lateral ditches, ponds, flood compensation areas and mitigation areas.
Cross Sections. The Engineer shall use Open Roads to generate preliminary cross-sections every 100 feet and at culvert locations and cross-street and driveway locations in conjunction with the Geometric Schematic. The Engineer shall determine earthwork volumes for use in the cost estimate, and shall prepare roll plots of the cross-sections.
Cross Sections. Road Sections: Taken at SO-foot intervals with the interval reduced to 25 feet adjacent to the bridge. Cross section width will be to the existing/proposed right of way line, or 10 feet beyond the proposed limit of disturbance, whichever is greater; • Stream Sections: Taken at 100-foot intervals for approximately 500 feet upstream and downstream of the bridge crossing for the width of the anticipated flood plain; and • Driveway Sections: Profiles of all existing and proposed driveways will also be measured to 75 feet from the existing roadway centerline.
Cross Sections. (i) Carriageway dimensions shall be as described in Table 1 of Appendix D.
Cross Sections. 6.3.6.4 Incorporate revised retaining wall design into cross sections 2 8 24 10 44 2 8 24 10 44 6.3.13 Calculate Office Check quantities and create quantity summaries 4 10 24 10 48 4 30 56 22 112 8 40 80 32 160 6.3.16 Calculate final quantities 1 2 8 2 13 1 4 16 6 27 2 6 24 8 40 6.3.19 Quality Assurance 12 12 28 28 40 40 Subtotal 71 256 440 257 1024 136 460 898 523 2017 207 716 0000 000 0000 6.4 Drainage
AutoNDA by SimpleDocs
Cross Sections. The Engineer shall use Geopak to generate preliminary cross-sections every 100 feet and at culvert locations or other critical locations in conjunction with the Geometric Schematic. The Engineer shall determine earthwork volumes for use in the cost estimate, and shall prepare 11”x17” sheets of the cross-sections. DocuSign Envelope ID: AAC8E920-9951-40B4-B77C-DDDA5AE10FF9 Retaining Walls Prepare preliminary retaining concepts to be shown on schematics, typical sections, and cross sections. • Determine if any additional walls are required and verify the need for and length of the retaining wall as shown on the ultimate schematic. • Compute and tabulate retaining wall quantities for preliminary design milestone plans submittal.
Cross Sections. Level of effort is included to complete roadway cross section sheets of Cliff Avenue and Willow Street within the project area. Sheets will illustrate the roadway sections and required grading.
Cross Sections. The Engineer shall use a Bentley 3D OpenRoads model to generate preliminary cross- sections every 50 feet and at culvert locations in conjunction with the Geometric Schematic. The Engineer shall assist with determining earthwork volumes for use in the cost estimate, and preparation of roll plots of the cross- sections.
Time is Money Join Law Insider Premium to draft better contracts faster.