Construction Submittals. The Applicant or their representative shall submit all applicable construction submittals defined in Tables 3-1 or 3-2 to the Railroad for review and approval following their own internal review and approval of the submittal. The Engineer- of-Record’s review comments must be submitted to the Railroad along with the construction submittal. Design A Concept (Plans and Site Pictures) 4 hard copies and .pdf 4 weeks B 30% (Applicant response, Design Plans, Project Specifications, Drainage Report, Shoofly Design, Construction Phasing Plans) 4 hard copies and .pdf 4 weeks C 100% (Applicant response, Design Plans, Project Specifications, Drainage Report, Shoofly Design, Construction Phasing Plans) 4 hard copies and .pdf 4 weeks Construction Shoring Falsework Demolition Erection Erosion Control Construction Phasing Plans 4 hard copies and .pdf 4 weeks All .pdf files shall be submitted on Compact Disc (CD) and may also be transmitted electronically via e-mail or through an internet ftp site A. The Concept Submittal shall, at a minimum, include the following: 1. Plan, Elevation and Typical Section of proposed grade separation. 2. Photo log with pictures of the proposed project location. Site pictures shall be in all controlling directions including, but not limited to, North, East, South and West. The plan view should show a reference location and direction for each picture. Four (4) sets of the concept submittal shall be transmitted to the Railroad Local Representative. Allow four
Appears in 2 contracts
Sources: Railroad Right of Way Agreement, Railroad Right of Way Agreement