Common use of Compliance with Applicable Laws and Requirements Clause in Contracts

Compliance with Applicable Laws and Requirements. In connection with its use, Tenant shall at its expense comply with the CC&R’s, all applicable laws, ordinances, regulations, codes and orders of any governmental or other public authority including without limitation, any and all Environmental Laws as defined in Paragraph 6.7.6 (together with any supplements or modifications thereto, “Applicable Laws”), and also including, without limitation, those requiring alteration of the Premises because of Tenant’s specific use or required pursuant to Paragraph 6.6; shall create no nuisance nor allow any objectionable liquid, odor, or noise to be emitted from the Premises; shall store no gasoline or other highly combustible materials on the Premises which would violate any applicable fire code or regulation nor conduct any operation that shall increase Landlord’s fire insurance rates for the Premises, the Building or the Park; shall not invalidate or impair any roof warranty; and shall not overload the floors or utilities of the Premises beyond projected utility requirements which shall be provided by Tenant to Landlord within ten (10) days after the TI Construction Documents are finalized as set forth in Paragraph 2.2 above (“Equipment Load Limits”). Tenant, at Tenant’s sole cost and expense, shall obtain and maintain any and all permits and licenses required in order for Tenant to operate the Permitted Use in the Premises.

Appears in 2 contracts

Samples: Office Lease Agreement, Office Lease (Lionbridge Technologies Inc /De/)

AutoNDA by SimpleDocs

Compliance with Applicable Laws and Requirements. In connection with its use, Tenant (i) shall at its expense comply with the CC&R’sCC&Rs, all applicable laws, ordinances, regulations, codes and orders of any governmental or other public authority including without limitation, any and all Environmental Laws as defined in Paragraph 6.7.6 6.6.7 and the Americans with Disabilities Act of 1990 (collectively, together with any supplements or modifications thereto, “Applicable Laws”), and also including, without limitation, those requiring alteration of the Premises because of Tenant’s specific use (as opposed to general office use) or required pursuant to Paragraph 6.6; (ii) shall create no nuisance nor allow any objectionable liquid, odor, or noise to be emitted from the Premises; (iii) shall store no gasoline or other highly combustible materials on the Premises which would violate any applicable fire code or regulation nor conduct any operation that shall increase Landlord’s fire insurance rates for the Premises, the Building or the Park; (iv) shall not invalidate or impair any roof warranty; and (v) shall not overload the walls, ceilings floors or utilities electrical circuits of the Premises beyond projected utility requirements which or Building; (vi) shall not permit anything to be provided by Tenant done in the Premises or elsewhere in the Building or the Park in any manner that causes injury to Landlord within ten the Premises, the Building or the Park or any equipment, facilities or systems therein; and (10vii) days after shall not allow any pets or animals on the TI Construction Documents are finalized as set forth in Premises, except for dogs and service animals (subject to Paragraph 2.2 above (“Equipment Load Limits”6.2.1). Tenant, at Tenant’s sole cost and expense, shall obtain and maintain any and all permits and licenses required in order for Tenant to operate the Permitted Use in the Premises. Tenant shall not install any machinery or equipment which may exceed the Maximum Floor Load of the Premises without Landlord’s prior written consent; without limiting the foregoing, such consent may be conditioned upon Tenant retaining at Tenant’s sole cost and expense a qualified engineer or architect selected by Landlord whose opinion shall control regarding floor loads. Allowable ground floor load (the “Maximum Floor Load) is five hundred (500) pounds per square foot; installation of machinery or equipment having a floor load less than the Maximum Floor Load shall not require Landlord’s consent.

Appears in 2 contracts

Samples: AbSci Corp, AbSci Corp

Compliance with Applicable Laws and Requirements. In connection with its use, Tenant shall at its expense comply with the CC&R’sCC&Rs, all applicable laws, ordinances, regulations, codes and orders of any governmental or other public authority including without limitation, any and all Environmental Laws as defined in Paragraph 6.7.6 7.7.6 (collectively, together with any supplements or modifications thereto, "Applicable Laws"), and also including, without limitation, those requiring alteration of the Premises because of Tenant’s 's specific use or required pursuant to Paragraph 6.67.7; shall create no nuisance nor allow any objectionable liquid, odor, or noise to be emitted from the Premises; shall store no gasoline or other highly combustible materials on the Premises which would violate any applicable fire code or regulation nor conduct any operation that shall increase Landlord’s 's fire insurance rates for the Premises, the Building or the Park; shall not invalidate or impair any roof warranty; and shall not overload the floors or utilities electrical circuits of the Premises beyond projected utility requirements which shall be provided by Tenant to Landlord within ten (10) days after the TI Construction Documents are finalized as set forth in Paragraph 2.2 above (“Equipment Load Limits”)Premises. Tenant, at Tenant’s 's sole cost and expense, shall obtain and maintain any and all permits and licenses required in order for Tenant to operate the Permitted Use in the Premises.

Appears in 1 contract

Samples: Office Lease (Nautilus, Inc.)

Compliance with Applicable Laws and Requirements. In connection with its useuse of the Premises, Tenant shall at its expense comply with the CC&R’s, all applicable laws, ordinances, regulations, codes and orders of any governmental or other public authority including without limitation, any and all Environmental Laws as defined in Paragraph 6.7.6 (together with any supplements or modifications thereto, “Applicable Laws”), and also including, without limitation, those requiring alteration of the Premises because of Tenant’s specific use or required pursuant to Paragraph 6.66.7; shall create no nuisance nor allow any objectionable liquid, odor, or noise to be emitted from the Premises; shall store no gasoline or other highly combustible materials on the Premises which would violate any applicable fire code or regulation nor conduct any operation that shall increase Landlord’s fire insurance rates for the Premises, the Building or the Park; shall not invalidate or impair any roof warranty; and shall not overload the floors or utilities electrical circuits of the Premises beyond projected utility requirements which shall be provided by Tenant to Landlord within ten (10) days after the TI Construction Documents are finalized as set forth in Paragraph 2.2 above (“Equipment Load Limits”)Premises. Tenant, at Tenant’s sole cost and expense, shall obtain and maintain any and all permits and licenses required in order for Tenant to operate the Permitted Use in the Premises. Landlord certifies that as of the completion of Landlord’s Work all portions of the Premises improved or modified, or both, by Landlord’s Work shall comply with the requirements of the Americans with Disabilities Act of 1990, as amended (the “ADA”) to the extent required for obtaining a permanent Certificate of Occupancy for use of the Premises for the Permitted Use.

Appears in 1 contract

Samples: Lease (Nautilus, Inc.)

AutoNDA by SimpleDocs

Compliance with Applicable Laws and Requirements. 6.2.1. In connection with its use, Tenant shall at its expense comply with the CC&R’s, all applicable laws, ordinances, regulations, codes and orders of any governmental or other public authority including without limitation, any and all Environmental Hazardous Materials Laws as defined in Paragraph 6.7.6 6.6.6 (together with any supplements or modifications thereto, “Applicable Laws”), and also including, without limitation, those requiring alteration of the Premises because of Tenant’s specific use or required pursuant to Paragraph 6.6; shall create no nuisance nor allow any objectionable liquid, odor, or noise to be emitted from the Premises; shall store no gasoline or other highly combustible materials on the Premises which would violate any applicable fire code or regulation nor conduct any operation that shall increase Landlord’s fire insurance rates for the Premises, the Building or the Park; shall not invalidate or impair any roof warranty; and shall not overload the floors or utilities of the Premises beyond projected utility requirements which shall be provided by Tenant to Landlord within ten (10) days after the TI Construction Documents are finalized as set forth in Paragraph 2.2 above (“Equipment Load Limits”). Tenant, at Tenant’s sole cost and expense, shall obtain and maintain any and all permits and licenses required in order for Tenant to operate the Permitted Use in the Premises. Tenant shall not commit any public or private nuisance or any other act or thing, which might or would disturb the quiet enjoyment of any tenant or occupant of the Building, any other portion of the Project or any nearby property. Tenant shall not invalidate or impair any roof warranty; nor place any loads upon the floors, walls or ceilings in excess of the maximum designed load determined by Landlord or which endanger the structure; nor place any harmful liquids in the drainage systems; nor dump or store waste materials or refuse or allow such to remain outside the Building proper, except in the enclosed trash areas provided. Tenant shall not store or permit to be stored or otherwise placed any other material of any nature whatsoever outside the Building.

Appears in 1 contract

Samples: Minerva Surgical Inc

Time is Money Join Law Insider Premium to draft better contracts faster.