Close-Out Deliverables Sample Clauses
Close-Out Deliverables. The deliverables set forth in Exhibit N are required during the Project’s Close-Out and prior to Final Payment, as set forth in Section 10.12.
Close-Out Deliverables. 1. A complete set of the Design-Builder’s Project files.
2. A complete set of product manuals (O&M), training videos, warranties, etc.
3. As built record drawings.
4. Attic stock and schedule.
5. Equipment schedule.
6. Proposed schedule of maintenance.
7. Environmental, health & safety documents.
8. LEED – Preliminary Construction Review.
9. All applicable inspection certificates/permits (boiler, elevator, emergency evacuation plans, health inspection, etc.).
Close-Out Deliverables. The deliverables set forth in Exhibit D are required during the Project’s Close-Out and prior to Final Payment, to include but not limited to.
a) A complete set of the Contractor’s Project files
b) A complete set of product manuals (O&M), training videos, warranties, etc.
c) As built record drawings
d) Attic stock and schedule
e) Equipment schedule
f) Proposed schedule of maintenance g) Environmental, health & safety documents
Close-Out Deliverables. The deliverables set forth in Exhibit N are required during the Project’s Close-Out and prior to Final Payment, as set forth in Section 10.12.
.1 a complete set of product manuals (O&M), training videos, warranties, etc. .2 as built record drawings. .3 attic stock and schedule.
Close-Out Deliverables. The deliverables set forth in Exhibit N are required during the Project’s Close-Out and prior to Final Payment, as set forth in Section 10.12 and below: Deliverables shall include those outlined in Exhibit T (DGS Close-Out Manual) including but not limited to the below items. If there is a conflict between Exhibit T and the deliverable list below, Exhibit T shall prevail.
a) A complete set of the Design-Builder’s Project files.
b) A complete set of product manuals (O&M), training videos, warranties, etc.
c) As-built record drawings.
d) Attic stock and schedule.
e) Equipment schedule.
f) Proposed schedule of maintenance.
g) Environmental, health & safety documents.
Close-Out Deliverables. The deliverables set forth in Exhibit D are required during the Project’s Close-Out and prior to Final Payment, to include but not limited to.
a. a complete set of product manuals (O&M), training videos, warranties, etc.
b. as built record drawings and building information model(s).
c. attic stock and schedule.
d. equipment schedu0le.
e. proposed schedule of maintenance.
f. environmental, health & safety documents.
g. all applicable inspection certificates/permits (boiler, elevator, emergency evacuation plans, health inspection, etc.).
h. a complete set of its Project files. i. LEED Silver Certification, compliant with International Green Construction Code and DOEE Storm Water Management requirements.
Close-Out Deliverables. The deliverables set forth in Exhibit D are required during the Project’s Close-Out and prior to Final Payment, to include but not limited to:
a) A complete set of the Contractor’s Project files;
b) A complete set of product manuals (O&M), training videos, warranties, etc.;
c) As built record drawings;
d) Attic stock and schedule;
e) Equipment schedule;
f) Proposed schedule of maintenance;
g) Environmental, health & safety documents;
h) LEED – Preliminary Construction Review;
i) All applicable inspection certificates/permits (boiler, elevator, emergency evacuation plans, health inspection, etc.); and
j) All other files and requirements outlined in Turnover Protocol Document.