Close-Out Deliverables. The deliverables set forth in Exhibit N are required during the Project’s Close-Out and prior to Final Payment, as set forth in Section 10.12.
Close-Out Deliverables. 1. A complete set of the Design-Builder’s Project files. 2. A complete set of product manuals (O&M), training videos, warranties, etc. 3. As built record drawings. 4. Attic stock and schedule. 5. Equipment schedule. 6. Proposed schedule of maintenance. 7. Environmental, health & safety documents. 8. LEED – Preliminary Construction Review. 9. All applicable inspection certificates/permits (boiler, elevator, emergency evacuation plans, health inspection, etc.).
Close-Out Deliverables. The deliverables set forth in Exhibit D are required during the Project’s Close-Out and prior to Final Payment, to include but not limited to. a) A complete set of the Contractor’s Project files b) A complete set of product manuals (O&M), training videos, warranties, etc. c) As built record drawings d) Attic stock and schedule e) Equipment schedule f) Proposed schedule of maintenance g) Environmental, health & safety documents
Close-Out Deliverables. The deliverables set forth in Exhibit N are required during the Project’s Close-Out and prior to Final Payment, as set forth in Section 10.12. .1 a complete set of product manuals (O&M), training videos, warranties, etc. .2 as built record drawings. .3 attic stock and schedule.
Close-Out Deliverables. The deliverables set forth in Exhibit N are required during the Project’s Close-Out and prior to Final Payment, as set forth in Section 10.12 and below: Deliverables shall include those outlined in Exhibit T (DGS Close-Out Manual) including but not limited to the below items. If there is a conflict between Exhibit T and the deliverable list below, Exhibit T shall prevail. a) A complete set of the Design-Builder’s Project files. b) A complete set of product manuals (O&M), training videos, warranties, etc. c) As-built record drawings. d) Attic stock and schedule. e) Equipment schedule. f) Proposed schedule of maintenance. g) Environmental, health & safety documents.
Close-Out Deliverables. The deliverables set forth in Exhibit D are required during the Project’s Close-Out and prior to Final Payment, to include but not limited to. a. a complete set of product manuals (O&M), training videos, warranties, etc. b. as built record drawings and building information model(s). c. attic stock and schedule. d. equipment schedu0le. e. proposed schedule of maintenance. f. environmental, health & safety documents. g. all applicable inspection certificates/permits (boiler, elevator, emergency evacuation plans, health inspection, etc.). h. a complete set of its Project files. i. LEED Silver Certification, compliant with International Green Construction Code and DOEE Storm Water Management requirements.
Close-Out Deliverables. The deliverables set forth in Exhibit D are required during the Project’s Close-Out and prior to Final Payment, to include but not limited to: a) A complete set of the Contractor’s Project files; b) A complete set of product manuals (O&M), training videos, warranties, etc.; c) As built record drawings; d) Attic stock and schedule; e) Equipment schedule; f) Proposed schedule of maintenance; g) Environmental, health & safety documents; h) LEED – Preliminary Construction Review; i) All applicable inspection certificates/permits (boiler, elevator, emergency evacuation plans, health inspection, etc.); and j) All other files and requirements outlined in Turnover Protocol Document.