Calibrated Automated Thrombogram (CAT Sample Clauses

Calibrated Automated Thrombogram (CAT. 1.5.5.2.1 The mechanism of the CAT Xxxxxx and colleagues have developed a method to measure thrombin generation which was reproducible and accurate. (Xxxxxx et al., 2003) The thrombin generation assay measures the ability of plasma to generate thrombin following in-vitro activation of coagulation with tissue factor. A thrombin generation curve is produced which reflects both the initiation and propagation phase of coagulation, as well as the anti-coagulant and fibrinolytic phases. (Xxxxxx et al., 2000) CAT measures thrombin generation in whole or platelet poor plasma. (Xxxxxxx et al., 2013) The CAT test is performed in triplicate on the sample and on the calibrator, using a microtitre plate. In the measurement xxxxx, tissue factor and phospholipid vesicles are added to initiate coagulation, then a combination of calcium chloride and fluorogenic substrate is added to the sample. A known amount of substrate converting activity is added to the plasma in the xxxxx and a low-affinity fluorogenic substrate for thrombin is added. Thrombin causes splitting of the substrate, thus, the thrombin activity in the clotting plasma is continuously monitored via the colour change. The developing fluorescence is recorded by a fluorometer and the fluorescence output values are converted into thrombin generation curves by an integrated software, comparing the fluorogenic activity to a constant known thrombin activity in a simultaneously run non-clotting sample. The calibration xxxxx contain the thrombin calibrator, which consists of thrombin bound to alpha2- macroglobulin, which cannot be split by plasma protease inhibitors, thus, these xxxxx do not clot. The calibration xxxxx have a standard known amount of substrate converting activity, thus, the fluorogenic substrate is converted at a constant rate by the added thrombin calibrator. (Xxxxxx et al., 2000; Xxxxxx et al., 2003; Xxxxxx, Xxxx, 2004) The parameters of the thrombin generation curve are described in terms of lag time, peak height, area under the curve, time to peak and start tail (figure 3).
AutoNDA by SimpleDocs

Related to Calibrated Automated Thrombogram (CAT

  • Purchase Order Flip via Ariba Network (AN) The online process allows suppliers to submit invoices via the AN for catalog and non- catalog goods and services. Contractors have the ability to create an invoice directly from their Inbox in their AN account by simply “flipping” the purchase order into an invoice. This option does not require any special software or technical capabilities. For the purposes of this section, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider of MFMP the right and license to use, reproduce, transmit, distribute, and publicly display within the system the information outlined above. In addition, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider the right and license to reproduce and display within the system the Contractor’s trademarks, system marks, logos, trade dress, or other branding designation that identifies the products made available by the Contractor under the Contract.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • DELIVERY: FOB DESTINATION, INSIDE DELIVERY, FREIGHT PAID Whenever possible, contractors should give the ordering entities 3 working days prior notice of any deliveries and/or installations. Furniture contractors will not be responsible for the removal/moving of existing furnishings unless requested by the ordering entity. Contractors should verify site readiness prior to delivery. All deliveries will be made during normal working hours unless otherwise arranged with the ordering entity. Contractor will communicate any scheduling delays and/or changes immediately. Agencies will not be responsible for any freight damage, concealed or otherwise.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • SAMPLE (i) Unless agreed otherwise, wheeled or track lay- ing equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails approved under B5.1 or B6.422. Purchaser may be required to backblade skid trails and other ground disturbed by Purchaser’s Opera- tions within such areas in lieu of cross ditching required under B6.6. Additional special protection measures needed to protect such known areas are identified in C6.24.

  • Drug Test The compulsory production and submission of urine and/or blood, in accordance with departmental procedures, by an employee for chemical analysis to detect prohibited drug usage.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

Time is Money Join Law Insider Premium to draft better contracts faster.