Bridge Superstructure Sample Clauses

Bridge Superstructure. Prepare final design computations for the bridge superstructure elements including deck, supporting beams or girders, and corral rail.
AutoNDA by SimpleDocs

Related to Bridge Superstructure

  • Framework Management Structure 2.1.1 The Supplier shall provide a suitably qualified nominated contact (the “Supplier Framework Manager”) who will take overall responsibility for delivering the Goods and/or Services required within this Framework Agreement, as well as a suitably qualified deputy to act in their absence.

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Caisson Rock Caisson Rock is defined as material that must be removed from a shaft which cannot be penetrated faster than two feet per hour (fifteen minute minimum) using a rock auger with bullet-shaped hardened steel teeth (Kennametal bits or equivalent), and the drilling equipment should have the capacity to produce a continuous torque of at least 1,000,000 inch pounds and a downward force of at least 50,000 pounds (a Xxxxxx LLDH in good working condition) for piers up to seventy two inches in diameter. Use of equipment with greater torque or downward force modifies the definition of refusal to be the point at which the equipment cannot penetrate faster than two feet per hour (fifteen minute minimum). In rare cases, refusal may occur on a rock seam or boulder above the general massive rock surface. The compensation for Caisson Rock should include only material that cannot be penetrated by the rock auger at the specified rate.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Documentation control Specify how documentation will be identified with an alpha numeric which indicates source, recipient, communication number etc. Provide details of any particular format or other constraints; for example that all contractual communications will be in the form of properly compiled letters or forms attached to e mails and not as a message in the e mail itself. State any particular routing requirements but note from TSC3 who issues what to whom.

  • Tender Opening 24.1 Except as in the cases specified in ITT 23, the Procuring Entity shall, at the Tender opening, publicly open and read out all Tenders received by the deadline at the date, time and place specified in the TDS in the presence of Tenderers' designated representatives who choose to attend, including to attend any specific electronic tender opening procedures if electronic tendering is permitted in accordance with ITT 21.1, shall be as specified in the TDS.

  • Notice to Proceed - Land Acquisition The acquisition of the Land shall not occur until the Director has issued a written Notice to Proceed for land acquisition to the Recipient (the "Notice to Proceed"). Such Notice to Proceed will not be issued until the Director has received a Request to Proceed acceptable to the Director and is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and any requirements for land acquisition set forth in this Agreement, including without limitation the OPWC's approval of the proposed Deed Restrictions and Title Agent. The Notice to Proceed also shall specify the time frame for the Closing.

  • Commencement of Interconnection Activities If the Developer executes the final LGIA, the ISO, Connecting Transmission Owner and the Developer shall perform their respective obligations in accordance with the terms of the LGIA, subject to modification by FERC. Upon submission of an unexecuted LGIA in accordance with Section 30.11.3, the Parties shall promptly comply with the unexecuted LGIA, subject to modification by FERC.

  • Vyšší moc The performance by either Party of any obligation on its part to be performed hereunder shall be excused by floods, fires or any other Act of God, accidents, wars, riots, embargoes, delay of carriers, inability to obtain materials, failure of power or natural sources of supply, acts, injunctions, or restraints of government or other force majeure preventing such performance, whether similar or dissimilar to the foregoing, beyond the reasonable control of the Party bound by such obligation, provided, however, that the Party affected shall exert its reasonable efforts to eliminate or cure or overcome any of such causes and to resume performance of its obligations with all possible speed. Splnění jakékoli povinnosti kteroukoli ze Stran, jež má být takovou Stranou splněna na základě podmínek této Smlouvy, bude prominuto v důsledku záplav, požárů či jiných projevů Vyšší moci, nehod, válek, nepokojů, embarg, prodlení dopravců, nemožnosti opatřit příslušné materiály, nebude-li dodána elektrická energie či jiné přírodní zdroje, v důsledku rozhodnutí, zákazů či omezení státního/správního úřadu či jiného prvku vyšší moci, který zabrání splnění takové povinnosti, bez ohledu na to, zda je shodný či odlišný od shora uvedeného, a který stojí mimo možnost ovlivnění příslušné Strany, která je takovou povinností vázána, to však za podmínky, že takto dotčená Strana vyvine odpovídají úsilí za účelem odstranění či nápravy či překonání jakéhokoli takového důvodu či příčiny a bude pokračovat v plnění svých povinností x xxxxxxxxxx xxxxxx xxxxxxx xxxxxxxx.

  • Contract Closure Contracting Officer shall give appropriate written notice to Purchaser when Purchaser has complied with the terms of this contract. Purchaser shall be paid refunds due from Timber Sale Account un- der B4.24 and excess cooperative deposits under B4.218.

Time is Money Join Law Insider Premium to draft better contracts faster.