Blowers Clause Samples

Blowers. AC Motors (synchronous / induction)
Blowers. ( ) 1; ( ) 2; ( ) 3; ( ) 4; ( ) 5; ( ) 6.
Blowers. For the purposes of this proposal, the range of blower capacity has been assumed to be adequate for this upgrade. MLSS concentration in the membrane tank during annual average, max month, and max week flows must not exceed 10 g/L and during max day and peak hour flows must not exceed 12 g/L. For expansion options, biological system expansion design, including equipment, will be completed by North Las Vegas or their 3rd party designate. Trash and non-biodegradable solids, such as hair, lint, grit and plastics may foul or damage the membranes if allowed to pass into the membrane chamber. SUEZ recommends that an internally-fed screen with mesh or punched-hole openings less than or equal to 2 mm with no possibility of bypass or carryover be operated upstream of the new membranes to ensure effective operation and to maximize membrane life.
Blowers. Nos. (1 OP+1 SB) Make: USHA COMPRESSORS Model: UGRK100 Capacity: 50 cum/hr@0.5kg/▇▇.▇▇ Motor Quantity: 2 Nos. (1 OP+ 1 SB) HP: 5HP Speed: 1450 rpm Make: ABB
Blowers. Blowers shall be operated in a responsible manner when use has been approved by the Technical Representative. Dirt, dust and debris shall be controlled, blown into a pile and removed by the Contractor. The Contractor shall be held responsible for any damages incurred to persons or property. It is always a better choice to sweep where people and cars are present.