Availability Requirements. 1.7.1 The Government will deliver the vessel from PSNS/IMF Bremerton, WA to the Contractors facility. Upon completion of all work, the Government will take custody of vessel at the contractor’s facility. Contractor shall provide all materials, labor, and insurance bonds necessary for the period that the vessel is located at the Contractor’s repair facility. 1.7.2 Provide quantity 7 heated/air conditioned office space measuring a minimum of 160 square feet and located within 1/4 mile of the vessel from 2 days prior to project start to 2 days after project completion for use by the COR. 1.7.2.1 The office spaces shall be equivalent to Satellite model 820MO, 8 feet X 20 feet interior size, with lockable doors and platform with stairs. 1.7.2.2 The offices space shall be lockable, secure, and safe for personnel and equipment. 1.7.2.3 Provide quantity 2 each keys for all doors and quantity 2 each master keys to fit all locks to the SOW COR. 1.7.2.4 Furnish quantity One each work station in each office with the following at each work station: 1.7.2.4.1 Quantity (One EA) duplex 110 volt receptacle. 1.7.2.4.2 Quantity (One EA) desk, 30 inches wide x 48 inches in length, with chair. Chair shall be adjustable in height, with swivel and adjustable arm rests. 1.7.2.4.3 Quantity (One EA) CAT-5 cable connection at 35 MBPS minimum download speed for a COR supplied desktop/laptop computer. This connection shall be separate from Contractor’s computer servers/networks 1.7.2.4.4 Quantity (One EA) trash can. 1.7.2.5 Provide a single network printer on the same network as connections in paragraph 1.7.2.4.3 for 1.7.2. 1.7.2.6 Provide designated Quantity 7 EA parking space adjacent to the office spaces of 1.7.2 for the entire contract period. 1.7.2.7 Provide Restroom (Quantity 2 EA) within 250 feet of office spaces of 1.7.2 both male and female unless unisex. 1.7.3 Provide electrical service equipment capable of supplying, 440 volt, 60 Hz, 3 phase, 100 amp electrical service to the vessel for the availability. Connect the electrical service equipment via the vessels shore power receptacle using a ▇▇▇▇▇▇▇ C4100C7W female connector or equal after the new switchboard has been installed and tested in paragraph 3.13 Shipalt 0053D. For the remainder of the availability provide power, water and air requirements IAW Table One. 1.7.4 Document the result of each inspection requirement within this SOW. 1.7.5 Do not operate or utilize existing, newly installed, or repaired shipboard equipment for or in the performance of the Contractor’s work effort. Government Representative as designated by the COR will accomplish such operation when required for test and checkout purposes. 1.7.6 Provide secured and monitored laydown area for storage of items listed in paragraph 4.0 as well as equipment removed as part of this work specification, until disposed of in accordance with the requirements of this work specification. 1.7.7 Provide one 50’ x 30’ with 20’ ceiling covered storage/lay-down area located within the facility confines of the vessel. Storage/ lay-down area will be covered, secured, lockable and monitored. Area is designated for storage of AIT items under contract numbers to be provided upon award IAW 1.7.14. Keys for area shall be provided to COR at availability start. 1.7.9 All work in compartment Port Bridge Wing, Starboard Bridge Wing, Ships Office 02-15-2-Q, Pilot House 03-16-0-Q, Engineers Booth 2-46-1-E, Starboard Steering 2-83-1-E, Port Steering 2-83-2-E and Engine Room 2-46-0-E under this work specification shall be completed no later than availability start date +
Appears in 2 contracts