Facility Requirements Sample Clauses

Facility Requirements. GRTC shall provide reasonable access to its Facilities for Contractor Personnel provided such Contractor Personnel comply with GRTC’s safety and health environmental rules, as well as any Facility-specific site requirements which may be provided by GRTC to Contractor.
Facility Requirements. A. A copy of Agency’s license that clearly substantiates Agency as a training facility of “exceptional quality” for Category 1 (this may include: local, state, or national licensing or acknowledgment of being a training facility capable of training national athletes and/or Olympic level participants) or a copy of a license or documentation (Tax ID #) that clearly substantiates the Agency as a training facility of “high quality” for Category 2.
Facility Requirements. The School shall use facilities that comply with the requirements in section 1002.33(18)
Facility Requirements. The Bank must provide a working location to support a full time staff of 6-8: one senior associate, one PM, and part-time people. It should comfortably sustain four desks and the necessary number of working tables and chairs for processing the events material. (1,500-2,000 square feet exclusive). The facility shall be secured and well lighted for access at any time. Unless otherwise noted by memo or addendum, the computer equipment that is supplied is the property of Bankmark. Bankmark and its personnel will not be restricted in any manner from access to its equipment or otherwise.
Facility Requirements. (Capabilities & Requirements for Design and Manufacturing) Area Requirements: Manufacturing • Square footage to support rate production Facility • Indoor assembly area • Separate fabrication / welding and assembly areas • 30T overhead crane with 20’ lift • 15T forklift • 3 phase 480V 60 Hz / 3 phase 400V 50 Hz for skid testing • Natural gas available (low priority) • Coil steel handling capability • CNC shear / punch / brake • Laser / plasma/water jet cutter • Automated welding (orbital welder for pipe, robot for sheet / plate) • CNC drilling (15-20’ horizontal bed for skid base drilling) • Rolls (tank sides / large diameter pipe) • Hydro / pneumatic testing (pipes / vessels) • Machine shop capabilities • Sand Blast / paint (liquid or powder coat) • Inspection tooling • I/C tools (4-20 loop calibrators, TC readouts, pressure calibrators) • Electrical tools (megger, hi-pot set) • Electrical Panel Shop • Adequate storage facility for completed BOPs. Capabilities • Certified welders (SMAW/GMAW) for structural and piping Required for • Mechanics / Pipe fitters / Assemblers BOP • Machinists / Toolmakers Fabrication * • Sheet metal fabricators • Wiremen / panel builders / electricians • Instrument technicians (capable of performing full BOP testing) • Insulators / Estimators • Independent Quality Assurance department • Purchasing • Shipping and Receiving • Painters • Manufacturing / Project engineers • Welding engineers (AWS familiarity) • Required within POSCO Power’s facility or through local contract vendors
Facility Requirements. All ADRC buildings shall meet the following facility requirements:
AutoNDA by SimpleDocs
Facility Requirements. The Customer’s Facility is located at , within the Company’s service area. The Customer intends to have its Facility installed and operational on or about , .
Facility Requirements. The Member certifies that the renewable equipment, its installation, its operation and its maintenance shall be in compliance with the following standards:
Facility Requirements. The City of Calabasas does not own a transit operations and maintenance facility for its Dial-A- Ride services. The contractor shall provide an operations and maintenance facility.
Time is Money Join Law Insider Premium to draft better contracts faster.