Common use of ASSIGNMENT AND SUB-CONTRACTING Clause in Contracts

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 20 contracts

Sources: Terms and Conditions of Contract for Services, Framework Agreement, Supply Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Contractor shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 5 contracts

Sources: Agreement for Dit Support, Event Planning & Delivery Services Agreement, Food Security Contract

ASSIGNMENT AND SUB-CONTRACTING. 8.1 11.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 11.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 11.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 4 contracts

Sources: Call Off Contract for Connectivity for Educational Establishments, Terms and Conditions of Contract for Goods and Services, Terms and Conditions of Contract for Goods and or Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-sub- contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 4 contracts

Sources: Award of Contract for the Supply of Certified Drug Reference Standards, Terms and Conditions, Terms and Conditions

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 4 contracts

Sources: Purchase Agreement, Terms and Conditions, Standard Terms and Conditions of Purchase

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-sub- contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 3 contracts

Sources: Terms and Conditions, Terms and Conditions, Terms and Conditions

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the AgreementAgreement without the written consent of the Customer. The Customer may, in addition to clause 5.8, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 3 contracts

Sources: Contract for Services, Contract for Services, Contract for Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 ‌ 9.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Contractor shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 2 contracts

Sources: Contract for Goods, Contract for Goods

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Contractor shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 2 contracts

Sources: Contract for Services, Contract for Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the AgreementAgreement without the written consent of the Customer. The Customer may, in addition to clause 4.8, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 2 contracts

Sources: Contract for Goods, Terms and Conditions of Contract for Goods

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Contractor shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 2 contracts

Sources: Contract for Services, Contract for Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-sub- contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 2 contracts

Sources: Supply Agreement, Contract for Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-sub- contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-sub- contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 2 contracts

Sources: Supply Agreement, Supply Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 8.1. The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 8.2. Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 8.3. The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 2 contracts

Sources: Supply Agreement, Contract for Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 11.1 The Supplier shall not without the written consent consent, which may not be unreasonably withheld, of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or and/or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 11.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 11.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Vehicle Rental Framework Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 . Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 . The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Service Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 8.1. The Supplier shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 8.2. Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 8.3. The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Contract for Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, ,novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Terms and Conditions

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, contract and novate or in any way dispose of the benefit and/ or the burden of the this Agreement or any part of the this Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the this Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.obliAggreaetmeinot. ns unde

Appears in 1 contract

Sources: General Terms and Conditions of Contract

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or and/or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-sub- contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: DPS Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-contractsubcontract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Contractor shall be responsible for the acts and omissions of its sub-sub- contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-sub- contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 1 contract

Sources: Award of Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the AgreementAgreement without the written consent of the Customer. The Customer may, in addition to clause 5.8, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-sub- contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Contract for Services

ASSIGNMENT AND SUB-CONTRACTING. 8.1 12.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-sub- contract, novation or disposal. The Supplier Contractor shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 12.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 12.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 1 contract

Sources: Award of Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Contractor shall be responsible for responsiblefor the acts and omissions of its sub-contractors as though those acts and omissions were omissionswere its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 1 contract

Sources: Agreement for Dit Support

ASSIGNMENT AND SUB-CONTRACTING. 8.1 10.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 10.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 10.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Terms and Conditions

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the this Agreement or any part of the this Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the this Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the this Agreement.

Appears in 1 contract

Sources: General Terms and Conditions of Contract

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, contract and novate or in any way dispose of the benefit and/ or the burden of the this Agreement or any part of the this Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the this Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the this Agreement.

Appears in 1 contract

Sources: General Terms and Conditions of Contract

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier Contractor shall not without the written consent of the Customer assign, sub-sub- contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Contractor shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Contractor shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Contractor provided that such assignment, novation or disposal shall not increase the burden of the SupplierContractor’s obligations under the Agreement.

Appears in 1 contract

Sources: Contract for Goods

ASSIGNMENT AND SUB-CONTRACTING. 8.1 10.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-sub- contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 10.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 10.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Purchase Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 9.1 The Supplier shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or and/or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier shall be responsible for the acts and omissions of its sub-sub- contractors as though those acts and omissions were its own. 8.2 9.2 Where the Customer has consented to the placing of sub-contracts, the Supplier shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 9.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier provided that such assignment, novation or disposal shall not increase the burden of the Supplier’s obligations under the Agreement.

Appears in 1 contract

Sources: Vehicle Purchase Framework Agreement

ASSIGNMENT AND SUB-CONTRACTING. 8.1 The Supplier Consultant shall not without the written consent of the Customer assign, sub-contract, novate or in any way dispose of the benefit and/ or the burden of the Agreement or any part of the Agreement. The Customer may, in the granting of such consent, provide for additional terms and conditions relating to such assignment, sub-contract, novation or disposal. The Supplier Consultant shall be responsible for the acts and omissions of its sub-contractors as though those acts and omissions were its own. 8.2 Where the Customer has consented to the placing of sub-contracts, the Supplier Consultant shall, at the request of the Customer, send copies of each sub-contract, to the Customer as soon as is reasonably practicable. 8.3 The Customer may assign, novate, or otherwise dispose of its rights and obligations under the Agreement without the consent of the Supplier Consultant provided that such assignment, novation or disposal shall not increase the burden of the SupplierConsultant’s obligations under the Agreement.

Appears in 1 contract

Sources: Consulting Agreement