Common use of Approved Plans and Working Drawings for Tenant Improvements Clause in Contracts

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayed. Following mutual approval of such proposed schematic plans by Landlord and by Tenant (as so approved, the “Approved TI Plans”), Tenant shall then cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings), final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Plans. Tenant shall deliver copies of the Final TI Working Drawings to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayed. Landlord shall promptly and diligently either approve Tenant’s proposed schematic plans or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the Building. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of the Approved TI Plans, superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Plans.

Appears in 3 contracts

Samples: Animal Care Agreement (OncoMed Pharmaceuticals Inc), Office Lease (OncoMed Pharmaceuticals Inc), Lease (OncoMed Pharmaceuticals Inc)

AutoNDA by SimpleDocs

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Xxxxxxxx) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED “Silver” certification level.

Appears in 2 contracts

Samples: Lease (Denali Therapeutics Inc.), Lease (Denali Therapeutics Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject cause to Landlord Delays be prepared and Unavoidable Delays) develop with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI PlansLandlord. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the any proposed schematic plans and outline specifications and/or any proposed Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the Building. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans.

Appears in 2 contracts

Samples: Lease Agreement, Lease (Complete Genomics Inc)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED “Silver” certification level.

Appears in 2 contracts

Samples: Lease (Tenaya Therapeutics, Inc.), Lease (Global Blood Therapeutics, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Prior to execution of this Workletter, Tenant shall promptly has prepared and diligently (subject delivered to Landlord Delays and Unavoidable DelaysLandlord and Tenant have mutually approved schematic plans (including demolition plans and equipment plans) develop with TI Architect a space plan for the Tenant Improvements proposed to be constructed initially by Tenant in the Premises during the Amgen Sublease term, which plans (for identification purposes) are described or labeled as follows: DGA Architects Schematic Plan for Project No. 09201 dated March 11, 2010, consisting of sheets identified as First Floor Demolition Plan (Sheet A2.ld), Second Floor Demolition Plan (Sheet A2.2d), First Floor Equipment Plan (Sheet A2.1q) and cause TI Architect Second Floor Equipment Plan (Sheet A2.2q) (collectively, the “Approved Schematic Plans”). With respect to prepare any other Tenant Improvements proposed schematic plans for to be constructed by Tenant in the Tenant Improvements. future in the Premises and/or the Expansion Premises (if applicable), Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayed. Following delayed by Landlord) proposed schematic plans and outline specifications for such Tenant Improvements, and following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approvedTenant, the plans and specifications thus approved shall constitute the Approved TI Plans”), Schematic Plans for the applicable work. Tenant shall in either such event then cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings), final detailed working drawings all of which information and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Plans. Tenant shall decisions Landlord will deliver copies of the Final TI Working Drawings to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayed. Landlord shall promptly and diligently either approve Tenant’s proposed schematic plans or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the Building. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of the Approved TI Plans, superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Plans.diligence),

Appears in 2 contracts

Samples: Lease (Five Prime Therapeutics Inc), Lease (Five Prime Therapeutics Inc)

Approved Plans and Working Drawings for Tenant Improvements. Tenant Not later than April 16, 2012, Landlord’s Architect shall promptly and diligently prepare, in conjunction with Tenant, to the extent required, preliminary plans (subject the “Landlord’s Preliminary Plan”) in order to Landlord Delays and Unavoidable Delays) develop with TI Architect a space plan allow for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for construction by Landlord of the Tenant Improvements. Tenant Landlord shall deliver copies of such proposed schematic plans to Landlord for submit the Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayedPreliminary Plan to Tenant for Tenant’s approval and information. Following mutual approval of such proposed schematic plans by Landlord and by Within seven (7) business days after Tenant (as so approved, the “Approved TI Plans”)has received Landlord’s Preliminary Plan, Tenant shall then either approve Landlord’s Preliminary Plan or set forth in writing with particularity any changes necessary to bring the Preliminary Plan into a form which will be reasonably acceptable to Tenant. In the event the parties cannot reach agreement and resolve all disputed matters relating to the Landlord’s Preliminary Plan, representatives of both parties shall promptly make themselves available to discuss and resolve any such disputed matters, and Landlord’s Preliminary Plan shall promptly be revised by Landlord to incorporate any agreed upon changes. In the event the parties cannot reach agreement and resolve all disputed matters relating to the Landlord’s Preliminary Plan, any delay shall be an Unavoidable Delay. Within seven (7) days after the parties have approved Landlord’s Preliminary Plan, Landlord shall prepare or cause to be prepared, promptly and diligently prepared (assuming timely delivery by Landlord Tenant of any all information and decisions reasonably required to be furnished or made by Landlord Tenant in order to permit preparation of final working drawingsLandlord’s Final Working Drawings, and subject to Tenant Delays and Unavoidable Delays), final detailed working drawings and specifications for the Tenant Improvements constituting Tenant Improvements, including (without limitationas applicable) any applicable structural, fire protection, life safety, mechanical, electrical and plumbing working drawings drawings, and final architectural drawings (collectively, “Landlord’s Final TI Working Drawings”), which . Landlord’s Final TI Working Drawings shall substantially conform to be based on and consistent with Landlord’s Preliminary Plan in all material respects (except as otherwise mutually approved by the Approved TI Plansparties in their respective discretion). Tenant shall deliver copies Within seven (7) days after receipt of the Final TI Working Drawings to Landlord for Landlord’s approvalFinal Working Drawings, which shall not be unreasonably withheld, conditioned or delayed. Landlord Tenant shall promptly and diligently either approve TenantLandlord’s proposed schematic plans or proposed Final TI Working Drawings, as applicable, Drawings or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and specifications or proposed Landlord’s Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in Tenant. In the case of - event the parties cannot reach agreement and resolve all disputed matters relating to the Landlord’s Final TI Working Drawings, into substantial conformity with representatives of both parties shall promptly make themselves available to discuss and resolve any such disputed matters, and the Approved TI PlansLandlord’s Final Working Drawings shall promptly be revised by Landlord to incorporate any agreed upon changes. In the event the parties cannot reach agreement and resolve all disputed matters relating to the Landlord’s Final Working Drawings, any delay shall be an Unavoidable Delay. Notwithstanding any other provisions of this paragraph, Landlord reserves if Tenant objects to any aspect of Landlord’s Final Working Drawings (including, but not limited to, any subsequently proposed changes therein from time to time) that is (i) materially consistent with the right Landlord’s Preliminary Plan, (ii) necessitated by applicable law or as a condition of any governmental or other third-party approvals or consents that are required to condition its approval be obtained in connection with Tenant Improvements, or (iii) that is required as a result of unanticipated conditions encountered in the course of construction of Tenant Improvements, then any delays in the completion of the proposed schematic plans and/or Landlord TI Work resulting from such objection or Landlord’s Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the Building. Upon approval of the Final TI Working Drawings by Landlord and Tenantresulting from such objection, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of the Approved TI Plans, superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Plansa Tenant Delay.

Appears in 2 contracts

Samples: www.sec.gov, Lease (Linkedin Corp)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. If reasonably requested by Tenant, the Approved TI PlansPlans may include re-used lab casework which is in reasonably good condition.

Appears in 2 contracts

Samples: Lease (Annexon, Inc.), Lease (Annexon, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Landlord shall reimburse the Architect directly for the cost of the initial schematic plans and outline specifications and one revision thereof, and such costs shall not be charged to the Tenant Improvement Allowance. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 5 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED "Silver" certification level.

Appears in 1 contract

Samples: Sublease (Sutro Biopharma, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Landlord shall reimburse the Architect directly for the cost of the initial test-fit plans and outline specifications and one revision thereof, and such costs shall not be charged to the Tenant Improvement Allowance. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 5 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED “Silver” certification level.

Appears in 1 contract

Samples: Lease (Alector, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements, which shall include two (2) separate designs for the 1st floor of the Premises, one of which shall be for a standard office/laboratory design, similar to that on the 2nd and 3rd floors of the Premises (the “Standard Buildout”), and the other of which shall be for a “GMP manufacturing suite” (the “GMP Suite”). Landlord shall reimburse the Architect directly for the cost of the initial test-fit plans and outline specifications and one revision thereof, and such costs shall not be charged to the Tenant Improvement Allowance. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 5 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements (not including improvements in the GMP Suite) will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED "Silver" certification level. For the avoidance of doubt, the Tenant Improvements do not need to include all of the Premises and Tenant may choose not to perform improvements in, or perform only minimal improvements in, a floor of the Premises, provided that Tenant hereby agrees that Tenant shall perform improvements or Alterations to build out the entirety of the Premises to a commercially reasonable level beyond the Warm Shell Condition prior to the expiration of the third (3rd) full year of the Lease Term, subject to Force Majeure.

Appears in 1 contract

Samples: Lease (Graphite Bio, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver EXHIBIT B BRITANNIA POINTE GRAND BUSINESS PARK[Denali Therapeutics, Inc.][First Amendment] 2 promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED "Silver" certification level. Subject to its review of more detailed plans, Landlord hereby approves of the improvements shown on the preliminary plans attached hereto as Schedule 5.

Appears in 1 contract

Samples: Lease (Denali Therapeutics Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED "Silver" certification level.

Appears in 1 contract

Samples: Lease (CytomX Therapeutics, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans.

Appears in 1 contract

Samples: Lease (Dynamics Special Purpose Corp.)

AutoNDA by SimpleDocs

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayed. Following mutual approval of such proposed schematic plans by Landlord and by Tenant (as so approved, the “Approved TI Plans”), Tenant shall then cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings), final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Plans. , Tenant shall deliver copies of the Final TI Working Drawings to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayed. Landlord shall promptly and diligently either approve Tenant’s proposed schematic plans or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the Building. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of the Approved TI Plans, superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Plans.

Appears in 1 contract

Samples: Animal Care Agreement (Revolution Medicines, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Lxxxxxxx) proposed schematic plans and outline specifications for the Tenant Improvements. Landlord shall reimburse the Architect directly for the cost of the initial schematic plans and outline specifications and one revision thereof, and such costs shall not be charged to the Tenant Improvement Allowance. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 5 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing EXHIBIT B with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED "Silver" certification level.

Appears in 1 contract

Samples: Five Prime Therapeutics Inc

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Landlord shall reimburse the Architect directly for the cost of the initial test-fit plans and outline specifications and one revision thereof, and such costs shall not be charged to the Tenant Improvement Allowance. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 5 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days.

Appears in 1 contract

Samples: Lease (Bolt Biotherapeutics, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Landlord shall reimburse the Architect directly for the cost of the initial test-fit plans and outline specifications and one revision thereof, and such costs shall not be charged to the Tenant Improvement Allowance. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 5 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED "Silver" certification level.

Appears in 1 contract

Samples: Lease (MyoKardia Inc)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be EXHIBIT B reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED “Silver” certification level.

Appears in 1 contract

Samples: Sublease (Alector, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Tenant shall promptly and diligently (subject to Landlord Delays and Unavoidable Delays) develop work with TI Architect a space plan for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans cause to be prepared and delivered to Landlord for Landlord’s approval, approval (which approval shall not be unreasonably withheld, conditioned or delayeddelayed by Landlord) proposed schematic plans and outline specifications for the Tenant Improvements. Following mutual approval of such proposed schematic plans and outline specifications by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery EXHIBIT B -4- THE COVE AT OYSTER POINT [First Amendment] [Global Blood Therapeutics, Inc.] by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within seven (7) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Substitute Premises to achieve a LEED “Silver” certification level.

Appears in 1 contract

Samples: Lease (Global Blood Therapeutics, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Prior to the date of the Lease, Landlord and Tenant shall promptly mutually approved schematic plans and diligently (subject to Landlord Delays and Unavoidable Delays) develop with TI Architect a space plan outline specifications for the Tenant Improvements and cause TI prepared by the Architect to prepare proposed schematic plans for the Tenant Improvements. Tenant shall deliver copies of such proposed schematic plans to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayed. Following mutual approval of such proposed schematic plans by Landlord and by Tenant (as so approved, the “Approved TI Schematic Plans”), which Approved Schematic Plans are attached hereto as Schedule 2. Following the execution of this Lease, Tenant shall then cause to be prepared, promptly and diligently with reasonable diligence (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently either approve Tenant’s proposed schematic plans or (and in all events within 10 days after receipt in the case of an initial submittal of proposed Final TI Working Drawings, and within 7 days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve such proposed Final TI Working Drawings or other plans and specifications, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans or proposed Final TI Working Drawings or other plans and specifications into a form which will be reasonably acceptable to Landlord. If Landlord orfails to respond within such ten (10) day or seven (7) day period, as applicable, then Tenant may send Landlord a reminder notice via email to Sxxxx Xxxx <sxxxx@XXXX.XXX> and Natalia De Mxxxxxx <nxxxxxxxxx@XXXX.XXX> setting forth such failure containing the following sentence at the top of such notice in bold, capitalized font at least twelve (12) points in size: "LANDLORD'S FAILURE TO RESPOND TO THIS NOTICE WITHIN TWO (2) BUSINESS DAYS SHALL RESULT IN LANDLORD'S DEEMED APPROVAL OF TENANT'S FINAL TI WORKING DRAWINGS" (the case "Tenant Improvements Reminder Notice"). Any such Tenant Improvements Reminder Notice shall include a complete copy of - the Final TI Working Drawings. If Landlord fails to respond within two (2) business days after receipt of a Tenant Improvements Reminder Notice, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or then Tenant’s Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the Buildingfor which Tenant requested Landlord's approval shall be deemed approved by Landlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans.

Appears in 1 contract

Samples: Lease (Unity Biotechnology, Inc.)

Approved Plans and Working Drawings for Tenant Improvements. Landlord’s Architect and project manager has prepared, and Landlord and Tenant shall promptly have approved, preliminary plans and diligently (subject to Landlord Delays specifications and Unavoidable Delays) develop with TI Architect a space plan scope of work for the Tenant Improvements and cause TI Architect to prepare proposed schematic plans for the Tenant ImprovementsPremises. Tenant shall deliver copies The most recent mutually approved version of such proposed schematic plans and specifications and scope of work is attached hereto as Schedule 4 to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned or delayed. Following mutual approval of such proposed schematic plans by Landlord and by Tenant this Exhibit B (as so approved, the “Approved TI Schematic Plans”), . Tenant shall then work with the Architect to cause to be prepared, promptly and diligently (assuming timely delivery by Landlord of any information and decisions required to be furnished or made by Landlord in order to permit preparation of final working drawings, all of which information and decisions Landlord will deliver promptly and with reasonable diligence), and delivered to Landlord for approval (which approval shall not be unreasonably withheld, conditioned or delayed by Landlord) final detailed working drawings and specifications for the Tenant Improvements, including (without limitation) any applicable life safety, mechanical, electrical and plumbing working drawings and final architectural drawings (collectively, “Final TI Working Drawings”), which Final TI Working Drawings shall substantially conform to the Approved TI Schematic Plans. Upon receipt from Tenant shall deliver copies of the proposed schematic plans and outline specifications, proposed Final TI Working Drawings to Landlord for Landlord’s approvalDrawings, which shall not be unreasonably withheldany other plans and specifications, conditioned or delayed. any revisions or resubmittals of any of the foregoing, as applicable, Landlord shall promptly and diligently (and in all events within 10 business days after receipt in the case of an initial submittal of schematic plans and outline specifications or proposed Final TI Working Drawings, and within 7 business days after receipt in the case of any other plans and specifications or any revisions or resubmittals of any of the foregoing) either approve Tenant’s such proposed schematic plans and outline specifications or proposed Final TI Working Drawings, as applicable, or set forth in writing with particularity any changes necessary to bring the aspects of such proposed schematic plans and outline specifications or proposed Final TI Working Drawings into a form which will be reasonably acceptable to Landlord or, in the case of - the Final TI Working Drawings, into substantial conformity with the Approved TI Plans. Notwithstanding any other provisions of this paragraph, Landlord reserves the right to condition its approval of the proposed schematic plans and/or Final TI Working Drawings upon reasonable specific modifications to reasonably facilitate future uses of the BuildingLandlord. Upon approval of the Final TI Working Drawings by Landlord and Tenant, the Final TI Working Drawings shall be deemed to be incorporated in and considered part of constitute the Approved TI Plans, ,” superseding (to the extent of any inconsistencies) any inconsistent features of the previously existing Approved TI Schematic Plans. Tenant shall respond to any request for information or approval of plans or drawings from Landlord or Architect within five (5) business days. Tenant acknowledges that the Tenant Improvements will include the items set forth on Schedule 2 to this Exhibit B, in order to allow the Premises to achieve a LEED “Silver” certification level.

Appears in 1 contract

Samples: Lease (Annexon, Inc.)