Tare mass definition

Tare mass means the mass of an empty container that does not contain any packages, cargo items, pallets, dunnage, or any other packing material or securing material.
Tare mass. , in relation to a trailer, means its unladen mass when it is in ordinary running condition and not carrying persons or goods;
Tare mass. , in relation to a vehicle, means the unladen mass of the vehicle together with the equipment prescribed to be carried upon or fitted to the vehicle and, in the case of a vehicle which uses fuel, approximately 10 litres of fuel;

Examples of Tare mass in a sentence

  • The following particulars, at least, shall be marked on the plate by stamping or by any other equivalent method: - Approval number; - Manufacturer's serial number; - Maximum working pressure (gauge pressure); - Test pressure (gauge pressure); - Contents: uranium hexafluoride; - Capacity in litres; - Maximum permissible filling mass of uranium hexafluoride; - Tare mass; - Date (month, year) of the initial test and the most recent periodic test; - Stamp of the expert who performed the tests.

  • A1.15 Tare mass means the mass of an empty container that does not contain any packages, cargo items, pallets, dunnage, or any other packing material or securing material.

  • It should be noted that Danish organizations are rather flat – Denmark scores low in power distance dimension, being known for high employee autonomy (Hofstede, 2019), which makes leaders such as process owners, quite informal leaders.

  • All the bales so selected in the sample shall be tested for 'Gross mass of bales', 'Tare mass of bailing hoops and other packing materials' and 'Number of bundles per bale'.

  • Truck chitSystem should capture the details of  Location of the measurement  Measurement date and time  Vehicle identity  Gross mass (if applicable)  Tare mass (if applicable)  Net mass (if applicable) 11.

  • This principle applies to legislation adopted through the initiative process." People v.

  • Maximum gross vehicle mass (GVM)80,990kgb) Tare mass (without cookie plate)39,590kgc) Tare mass (with cookie plate)40,990kgd) Maximum load40,000kge) Maximum un-braked towing load20,000kgf) Maximum operating speed17km/hg) Maximum grade25%(1:4)G D JERVISSENIOR INSPECTOR OF MECHANICAL ENGINEERING Under the delegated authority of the Chief Inspector of Coal Mines Issue No:19primary3Page 3 of 3Event No: 317528998001Prepared by: P.

  • MML Coal WagonsSpecifications and Fact Sheet▪ Tare mass 20,4 tonnes▪ Payload 61,6 tonnes▪ Wagon length over couplers 13,2 m▪ Axle load 20 tonnes▪ Volume 70,8 m³▪ Wheel diameter (new/worn) 863/813mm▪ Max critical speed 120 km/h▪ Min negotiable curve radii 85 m▪ Bogie type Self steering (HS MK VII)▪ Back actor scoop width 2 530 mm.

  • Tare mass means the mass of an empty container that does not contain any packages, cargo items, pallets, dunnage, or any other packing material or securing material.

  • Both staff and prisoners were enthusiastic about the wide-ranging benefits of the programme.


More Definitions of Tare mass

Tare mass means the mass of an empty container that does not contain any packages, pallets, dunnage, or any other packing material.
Tare mass means a vehicle’s unladen mass, as specified in its registration document;

Related to Tare mass

  • Mature marijuana plant means a marijuana plant that is not an immature marijuana plant.

  • Furniture maintenance product means a wax, polish, conditioner, or any other product designed for the purpose of polishing, protecting or enhancing finished wood surfaces other than floors. Furniture maintenance product does not include: dusting aids; wood cleaners, and products designed solely for the purpose of cleaning; and products designed to leave a permanent finish such as stains, sanding sealers and lacquers.

  • Billing Commencement Date means the earlier of:

  • Software Maintenance means the process of modifying software after delivery to correct faults, improve performance or other attributes, or adapt to a changed environment. (Reference ISO/IEC 14764:2006, as amended or superseded.) Software maintenance does not include any customization or configuration.

  • Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.

  • Peak Season means the weeks containing the 24th through 36th Wednesdays of the calendar year. Each such week shall begin on a Monday and end on the following Sunday, except for the week containing the 36th Wednesday, which shall end on the following Friday.

  • Open season means those times, manners of taking, and places

  • Services Commencement Date means the date delivery of the Services shall commence as specified in the Key Provisions. If no date is specified in the Key Provisions this date shall be the Commencement Date;

  • Submission Date means the date on which You Submit a Contribution to Us.

  • Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.

  • Service Commencement Date means the date the Transmission Provider begins to provide service pursuant to the terms of an executed Service Agreement, or the date the Transmission Provider begins to provide service in accordance with Tariff, Part II, section 15.3 or Tariff, Part III, section 29.1.

  • Double check valve assembly means an assembly composed of two single, independently acting, check valves including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the water tightness of each check valve.

  • Scheduled Commissioning Date or “SCD” of the Project shall mean [Insert Date];

  • Peak Period means the time between 6 a.m. and 10 p.m. (April through September) or between 7 a.m. and 11 p.m. (October through March) on all days except Saturdays and Sundays, which daily time period will be subject to change from time to time at the Company's option. This change would occur after no less than ten (10) days notice has been given to all Customers who would be affected, and to the Commission.

  • Start Date for Term Calculation Purposes Only: Regardless of actual award/effective date of Contract, for Agreement “term” calculation purposes only, the Agreement “start date” is the last day of the month that Award Notifications are anticipated as published in the Solicitation. Example: If the anticipated award date published in the Solicitation is August 27, 2020 but extended negotiations delay award until September 24, 2020 the end date of the resulting initial “two-year” term Agreement, (which is subject to an extension(s)) will still be August 31, 2022 in this example