Spillway Design Storm definition

Spillway Design Storm means the storm upon which the hydraulic capacity of the spillway structure is designed.

Examples of Spillway Design Storm in a sentence

  • The requirements in the table below shall apply in place of the Minimum Spillway Design Storm table under Rule .0205(e) of this Section.

  • Tr. at 125:25 to 126:1, 468:20-23 (Thomas).Engineers call the flood pool expected from the Spillway Design Storm the “Spillway Design Flood,” often shortened to “SDF.”At Addicks and Barker Reservoirs, engineers currently base the SDF on the “Probable Maximum Flood,” the flooding expected to occur during the “Probable Maximum Precipitation” (“PMP”), the worst rainfall that engineers believe could be generated in the region.

  • The most significant and, at times, prohibitive cost of an accurate hazard classification or Spillway Design Storm study for a small dam is incurred during the development of the hydraulic model of the downstream waterway.

  • Since the majority of dams subject to local or state dam safety regulations have drainage areas less than 10 square miles, questions arise over the most appropriate temporal rainfall distribution to utilize in a hazard classification and/or Spillway Design Storm analysis.

  • This kind of map work is valuable because of the impact of space on the social relations of young people.

  • The Spillway Design Storm incorporated an updated probable maximum rain event, known as the Probable Maximum Precipitation.

  • Crucially, the amount of land the Government acquired for each of the two reservoirs represented far less than the total expanse of property certain to be inundated within the Maximum Design Pool for each reservoir associated with the Spillway Design Storm of over 40 inches of rain in 72 hours.

  • The minimum design storm used to calculate required spillway capacity must be determined according to the following table: Hazard Spillway Design Storm (SDS) Class I PMP Class II One-half PMPClass III 24 hour 100 year frequency, Type III storm* Class IV 24 hour 100 year frequency, Type III storm plus 50%* *Any later technology adopted by the U.S. Department of Agriculture, Natural Resources Conservation Service may be substituted for the use of the Type III storm.

  • Rather than acquire the entire property to be flooded within the Maximum Design Pool, the Government obtained title to land inside Addicks and Barker Reservoirs sufficient to hold about only half the amount of rain associated with the Spillway Design Storm.

  • Given storms having occurred after the construction of the Reservoirs/Dams that exceeded the original design rainfall amount (such as Tropical Storm Claudette which in 1979 dumped 43 inches of rain over just 24 hours in Alvin, Texas), the Government decided to update its design storm rainfall and account for the Spillway Design Storm in its Dams/Reservoirs’ redesign.

Related to Spillway Design Storm

  • Design storm means a hypothetical discrete rainstorm characterized by a specific duration, temporal distribution, rainfall intensity, return frequency, and total depth of rainfall.

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Uppermost aquifer means the geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer within the facility's property boundary.

  • Design-bid-build means a project delivery method in which:

  • Electrical contractor means an electrical contractor as defined in the Regulations;

  • Design torso angle means the angle measures between a vertical line through the "R" point and the torso line in a position which corresponds to the design position of the seat-back established by the vehicle manufacturer;

  • Electrical work Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” mark modular electrical accessories, Landline phone conduit, Cable TV wiring conduit, Separate line for inverter connection, Air-conditioner power point. Painting : Long Lasting and weather resistant acrylic paint to all external walls, All internal walls with white cement based putty finish with OBD. Plumbing & Sanitation : Sanitary ware for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen: Granite platform, ceramic tiles dado upto 2’ height, Stainless Steel sink in Kitchen, Aquaguard point, Connection for washing machine in wash area.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • medium voltage means the set of nominal voltage levels that lie above low voltage and below high voltage in the range of 1 kV to 44 kV;

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Plumbing contractor means a licensed master plumber or a person who employs a licensed master plumber full-time to directly supervise the installation of plumbing as his or her representative engaged in the business of plumbing for a fixed sum, price, fee percentage, valuable consideration, or other compensation and who is licensed as a plumbing contractor.

  • Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2

  • Hydrozone means a portion of the landscaped area having plants with similar water needs. A hydrozone may be irrigated or non-irrigated.

  • Firefighter means any regular, paid or volunteer, member of a lawfully constituted fire department of a municipal corporation, township, fire district, or village.

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • Generator Operator means the Person that Operates the Generating Facility and performs the functions of supplying electric energy and interconnected operations services within the meaning of the NERC Reliability Standards.

  • Area of shallow flooding means a designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate; and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Design pressure means the hydrostatic pressure for which each structure or appliance assumed watertight in the intact and damage stability calculations is designed to withstand.

  • Excavation means the mechanical removal of earth material.

  • Design-build entity means a partnership, corporation, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.

  • Riser means a watertight vertical cylinder and lid allowing access to an OWTS component for inspection, cleaning, maintenance, or sampling.