Examples of Special Energy Meter in a sentence
Have installed Special Energy Meter (SEM) with telecommunication facility with availability based tariff (ABT) feature as per relevant CEA specifications / regulations as may be applicable.
Have installed Special Energy Meter (SEM) with telecommunication facility with availability based tariff (ABT) feature as per relevant CEA specifications / Regulations along with Automatic Meter reading arrangements.
Have installed Special Energy Meter (SEM) with telecommunication facility with availability based tariff (ABT) feature as per relevant CEA specifications / regulations along with automatic meter reading arrangements.
Have installed Special Energy Meter (SEM) with telecommunication facility with Availability Based Tariff (ABT) and Automated Meter Reading (AMR) feature as per relevant CEA specifications / regulations as may be applicable.
Installation of Special Energy Meter (SEM) as per the relevant Regulatory Provisions and Specifications issued by the Competent Authority as may be applicable and amended from time to time, at generation end as well as at consumer end shall be the prerequisite to seek open access.
The open access users shall provide ABT compatible Special Energy Meter as Main Meter, capable of time - differentiated measurements (15 minutes) of necessary parameters as may be specified by the STU or SLDC.
Care was taken in interpreting the impacts given in these reports, as robustness of the analysis in these reports varies, as well as definitions and categorisations of direct/indirect jobs.
The open access user shall provide ABT compatible Special Energy Meter as Main Meter capable of time differentiated measurements (15 minutes) of active energy and voltage differentiated measurement of reactive energy as may be specified by the STU or SLDC which shall be according to the Metering Code as may be specified by Central Electricity Authority based on voltage, point and period of supply and tariff category.
Further, For the purpose of energy accounting the Generator shall have to install Availability Based Tariff meter /Special Energy Meter at the metering point as well as on each source i.
In those where there is less development, a basic capacity such as online presence marks the decision.