Signaling Point of Interface Sample Clauses

Signaling Point of Interface. (SPOI): The point at which GTE hands off signaling information to Phone Michigan.
AutoNDA by SimpleDocs
Signaling Point of Interface. (SPOI): The point at which GTE hands off signaling information to SETI.
Signaling Point of Interface. (SPOI): The point at which GTE hands off signaling information to Tallgrass.

Related to Signaling Point of Interface

  • Point of Interconnection The Point of Interconnection shall be as identified on the one-line diagram attached as Schedule B to this ISA.

  • of Interconnection 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by ENT.

  • Establishment of Point of Interconnection The point where the electric energy first leaves the wires or facilities owned by the Cooperative and enters the wires or facilities provided by DG Owner/Operator is the "Point of Interconnection." Cooperative and DG Owner/Operator agree to interconnect the Facilities at the Point of Interconnection in accordance with the Cooperative's Rules and Regulations and DG Manual relating to interconnection of Distributed Generation (the "Rules") and as described in the attached Exhibit A. The interconnection equipment installed by the customer ("Interconnection Facilities") shall be in accordance with the Rules as well.

  • Signaling protocol The Parties will interconnect their networks using SS7 signaling where Technically Feasible and available as defined in GR 905 Telcordia Standards including ISDN User Part (ISUP) for trunk signaling and TCAP for CCS-based features in the Interconnection of their networks. All Network Operations Forum (NOF) adopted standards shall be adhered to. Where available, CenturyLink signaling services to link its Signaling Transfer Points (STPs) for CLEC switches which connect to CenturyLink’s STPs via “A” links or for CLEC’s STPs to connect to CenturyLink’s STPs via “D” links which are dedicated to the transport of signaling for local Interconnection, may be ordered from the CenturyLink Tariff.

  • Commencement of Interconnection Activities If the Developer executes the final LGIA, the ISO, Connecting Transmission Owner and the Developer shall perform their respective obligations in accordance with the terms of the LGIA, subject to modification by FERC. Upon submission of an unexecuted LGIA in accordance with Section 30.11.3, the Parties shall promptly comply with the unexecuted LGIA, subject to modification by FERC.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Signaling Each Party will provide the other Party with access to its databases and associated signaling necessary for the routing and completion of the other Party’s traffic in accordance with the provisions contained in the Unbundled Network Element Attachment or applicable access tariff.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Single Point of Contact The Contractor must provide, at the request of the Authorized User, a Single Point of Contact (SPOC) regardless of the breadth of the services being provided. The Contractor is required to provide the name and contact telephone numbers (desk, cell phone etc.) of the SPOC. RETAINAGE The Authorized User may retain a percentage of each deliverable payment of no more than twenty-five (25) percent until the acceptance of the complete Implementation. This retainage may be reduced up to 5 percent as described in the SOW, when the Contractor substantially reduces the time required from the timeframes negotiated between the Authorized User and the Contractor. ENHANCEMENTS TO SERVICES When the right is reserved in the RFQ, unanticipated enhancements to the services procured not exceeding a cumulative twenty (20) percent of the Implementation Service cost may be agreed to by the Authorized User. Such inclusion must be included in the Total Cost Evaluation. Such unanticipated enhancements will require a written Authorized User Agreement revision, which for NYS Agency Authorized Users will include an amended Purchase Order. Any changes that will result in exceeding this twenty (20) percent will require a new competitive RFQ. Contractor shall notify the Authorized User in writing when a requested scope change will exceed the cumulative twenty (20) percent total value of the Implementation Services.

  • Points of Interconnection As and to the extent required by Section 251 of the Act, the Parties shall provide Interconnection of their networks at any technically feasible point as described in Section 4.3. To the extent the originating Party’s POI is not located at the terminating Party’s relevant IP, the originating Party is responsible for transporting its traffic from it’s POI to the terminating Party’s relevant IP.