Examples of Phasing Plans in a sentence
Now, since results-oriented learning forbids interiorisation, we can expect today‘s accelerated pace of work to generate pathologies and familial relational difficulties, as we will explain in the fourth section (D).
Include separate mobilizations / demobilizations as required by the Project Schedule and Phasing Plans.
Trailers on sheet PHASE - 0 of the Phasing Plans and indicated with the note “TRAILERS TO BE MOVED BY OTHERS” will be moved over the period of time extending from XXXX XX,20XX, through YYYY YY,20YY.
CentreGreen Way, Suite 100Cary, NC 27513Subject: Notification per PRN 98-10 – change primary brand name Product Name: ARG Fluroxypyr TechnicalEPA Registration Number: 87373-99 Application Date: June 28, 2022Decision Number: 585811 Dear Ms. Suffill:The Agency is in receipt of your Application for Pesticide Notification under Pesticide Registration Notice (PRN) 98-10 for the above referenced product.
The Contractor shall prepare, review, analyze, and maintain up-to-date manpower documents such as the Manpower Estimate Reports (MERs), Preliminary Ship Manpower Documents (PSMDs), Navy Training Systems Plans (NTSPs), and Crew Scheduling and Phasing Plans (CSPPs), as requested.
References to Construction Safety and Phasing Plans (CSPP) in that document shall be interpreted to mean the phase limits, barricade locations, access points and notes shown on the construction activity plan sheets included in the as-bid contract documents.
Post construction schedule and Phasing Plans (Floor Tile, Paint) in back office area for clear viewing by all trades and workmen.
The school boards will monitor population and student demand based on the land use approvals, Development Concept Reports, and Phasing Plans, and identify to the City in advance when, and where, a school site may need to be secured.
In accordance with Section 11.3.15, development applications will require conceptual Block and Phasing Plans that demonstrate how these floor space indices are to be achieved over time.
Any Development Concept Reports or Phasing Plans that are required under Section 11.3.15 of this Secondary Plan are to illustrate how the policies of this Secondary Plan and associated guidelines are being addressed and can be addressed in both current plans and future phases of development.