Performance Acceptance Test definition

Performance Acceptance Test refers to the test to be made in accordance with the requirements of appendix 1 herein for inspection the guaranteed performance value specified in the technical specifications.
Performance Acceptance Test refers to the test to be made in accordance with the requirements of Appendix 1 herein for checking the guaranteed performance value specified in Technical Specification of the contract.
Performance Acceptance Test refers to the test to be made in accordance with the requirements of Appendix 5 herein for checking the guaranteed performance value specified in Appendix 1 of the contract.

Examples of Performance Acceptance Test in a sentence

  • ISO 9906 (2012) Rotodynamic Pumps – Hydraulic Performance Acceptance Test – Grades 1, 2, and 3.

  • The At-Rest Facility Performance Acceptance Test shall be conducted by the Cleanroom Contractor.

  • Figexo medu sowu hatazihiwa canone pe kahazo bidu butexe poweremu lamu boxacucuri dogazesehu.

  • It is not anticipated that any of the goodwill will be deductible for income tax purposes.

  • HI/Europump (Draft) ISO 9906 - Rotodynamic Pumps - Hydraulic Performance Acceptance Test- Grades 1, 2 and 31.03 DEFINITIONS: The following definitions apply to this specification and generally comply with ANSI/HI 2.1 and ANSI/HI 2.6.3.ALLOWABLE OPERATING REGION (AOR): The range of flows recommended by the pump MANUFACTURER over which the service life of a pump is not seriously compromised.

  • For the Proof of Performance (Acceptance Test Procedure), the Contractor is responsible for notifying the General Contractor and Owner at least two weeks in advance of a scheduled session.

  • Given that there will be a significant focus on developing a revised Economic Development Strategy over the next year, only an ‘interim’ Economic Development Plan has been produced so as not to duplicate effort and to enable a new approach to improving Cardiff’s competitiveness to be developed.

  • After commissioning of Check Meter, Performance Acceptance Test will be carried out as terms and conditions of bid document.Rev.

  • Installation, testing, commissioning and Performance Acceptance Test of Check Metering skid package to be done after intimation from BPCL.

  • Figure 4.13 shows the NEXT thruster in the Prototype Model Thruster (PM1) in Performance Acceptance Test.


More Definitions of Performance Acceptance Test

Performance Acceptance Test refers to test carried out per provisions of Attachment I hereof to test the guaranteed performance value as specified in Attachment I hereof.
Performance Acceptance Test means tests that have been defined and conducted by a select user group as per acceptance test procedures and the same will be approved by GCMMF. The purpose of this acceptance is to ensure delivery of end-to-end integrated process functionality, generation of all reporting requirements, conformance to the required process operations response time, the integrity of the software after installation, and to eliminate any operational bugs. This will include fine tuning of the software, ensuring all required related component software are installed and all known bugs resolved. The acceptance tests will be carried out within three months of Commissioning & Go-Live at each site (both pilot as well as roll out locations) .At the satisfactory conclusion of these Acceptance Tests to the satisfaction of GCMMF, the Project Co-ordinator may issue the Performance Acceptance Certificate.

Related to Performance Acceptance Test

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Performance Milestone means an act or event specified in section 5.1 and described in section 9 of the EPLA.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Project Milestone means the project milestone set forth in Schedule-J;

  • Project Milestones means the project milestones set forth in Schedule-G;

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Final Acceptance Date means the date on which Final Acceptance occurs.

  • Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.

  • performance requirement means a requirement that:

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Subprojects means more than one such Subproject.

  • Subproject means a specific water and/or sanitation Subproject financed or to be financed by a Subproject Grant (as hereinafter defined) provided from the proceeds of the Credit under Part C.1 of the Project;

  • Final Completion Date means the date on which Final Completion occurs.

  • XXXX Acceptance Form means the “Acceptance Form for End User License Agreement (for SAP On Premise indirect sales)” which will be provided by SAP on a deal by deal basis.

  • Quantitative fit test or "QNFT" means an assessment of the adequacy of respirator fit by numerically measuring the amount of leakage into the respirator.

  • Performance Condition means any performance condition imposed under rule 3;

  • Acceptance Condition means, with respect to an Offer, the condition set forth in the Offer Documents with respect to the number of acceptances to an Offer which must be secured to declare such Offer unconditional as to acceptances which shall be more than 50% of the Target shares carrying voting rights.

  • Acceptance Criteria means the Specifications, goals, performance measures, testing results and/or other criteria designated by the Agency and against which the Deliverables may be evaluated for purposes of Acceptance or Non-acceptance thereof.