Approved Installation definition
Examples of Approved Installation in a sentence
AT&T will also use this reading for billing purposes until the next quarterly meter reading is performed by AT&T or its AT&T Approved Installation Supplier.
Based upon the actual power usage measurement taken by AT&T or the AT&T Approved Installation Supplier, AT&T shall assess CLEC charges as set forth in the Pricing Schedule.
If CLEC fails to provide access to its physical Collocation Space or fails to provide AT&T/AT&T Approved Installation Supplier with a minimum of three (3) hours’ notice of the necessity to cancel and/or reschedule the appointment, then CLEC shall pay, for the missed meter reading a non-recurring charge, Page 6 of 32 as set forth in the Pricing Schedule, and shall pay a non-recurring charge as set forth in the Pricing Schedule for each additional meter reading trip required to measure CLEC’s power usage.
When CLEC elects to move to the power measurement usage option, the number of fused amps of DC Power infrastructure capacity requested by CLEC on its Initial or Subsequent Application will be used for calculating the number of amps to be billed for DC Usage until such time as AT&T or its AT&T Approved Installation Supplier can perform, under the currently existing quarterly meter reading schedule, a reading of CLEC’s power usage for the requested physical Collocation Space.
Once the date and time of access to CLEC’s caged Collocation Space(s) has been agreed upon, CLEC and AT&T, or its AT&T Approved Installation Supplier shall adhere to the agreed upon date and time, or provide a minimum of twenty-four (24) hours notice to the other Party if the original appointment(s) will be missed or must be canceled and rescheduled.
If CLEC fails to provide access to its caged Collocation Space(s) or fails to provide AT&T, or its AT&T Approved Installation Supplier, with sufficient notification of the missed appointment(s), as noted above, then CLEC shall pay the non- recurring “Additional Meter Reading Trip Charge”, as set forth in Exhibit A of this Attachment, for each additional meter reading trip that must be rescheduled to measure CLEC’s power usage for such caged Collocation Space(s).
This “Meter Reading” monthly recurring rate element will be assessed to CLEC for the first twelve (12) power circuits (each A and B feed counts as two circuits), and then for each additional two (2) circuits, read by AT&T or its AT&T Approved Installation Supplier at the rates set forth in Exhibit A of this Attachment and based on whether the power meter is provided by AT&T or its AT&T Approved Installation Supplier or CLEC.
Once the date and time of access to CLEC’s physical Collocation Space has been agreed upon, CLEC and AT&T or its AT&T Approved Installation Supplier shall adhere to the agreed upon date and time, or provide a minimum of three (3) hours’ notice to the other Party if the original appointment will be missed or must be cancelled and rescheduled.
In Page 8 of 32 such case, AT&T, or its AT&T Approved Installation Supplier will have the option of reading and recording the actual power usage from either the meter installed or maintained by CLEC on CLEC’s own BDFB(s) or via an AT&T provided measurement device.
If AT&T /AT&T Approved Installation Supplier fails to provide CLEC with a minimum of three (3) hours’ notice of the necessity to cancel and/or reschedule the appointment, AT&T shall not ▇▇▇▇ ▇▇▇▇ a non-recurring charge, as set forth in the Pricing Schedule for such missed appointment, and shall waive the charge for the next additional meter reading trip required to measure CLEC’s power usage.