WORK INCLUDED. All labor, materials, equipment and methods to construct, repair, and place into operation a storm drainage system including excavation, bedding, cast-in-place concrete formwork, and backfill as shown in the Civil Drawings and/or as specified and/or as directed in the field.
Appears in 4 contracts