Urinal Partitions Clause Samples

The 'Urinal Partitions' clause specifies the requirements for installing partitions between urinals in restrooms. It typically outlines the materials, dimensions, mounting methods, and finishes required for the partitions to ensure privacy and durability. By providing clear standards for installation and quality, this clause helps maintain user privacy and hygiene, while ensuring consistency and compliance with building codes.
Urinal Partitions a. Urinal partitions shall be white glazed vitreous china or 25mm thick marble of size. b. Porcelain partitions shall be fixed at proper height with C.P. brass bolts, anchor fasteners and M.S. clip as recommended by the manufacturer and directed by the Independent Engineer. 1. Scope of work a. Work under this section shall consist of furnishing all labour, materials, equipment and appliances necessary and required to completely install all soil, waste, vent and rainwater pipes. b. Without restriction to the generally of the foregoing, the soil, waste, vent and rainwater pipes system shall include thefollowings: (i) Vertical and Horizontal soil, waste and vent pipes, rainwater pipes & fittings, joint clamps and connections to thefixtures (ii) Connections of pipes of gully traps and manholes etc. (iii) Floor and urinal traps, cleanout plugs, inlet fittings and rainwater head as specified. (iv) Waste pipes connections from all fixtures e.g. wash basins, sinks, urinals, and kitchen equipments.