Test Strip. A test strip shall be placed with job site materials and approved by the Engineer. The weather and time of day, day or night, during the test strip shall be similar to expected conditions during construction. Upon completion of the test strip the Engineer will approve the mixture for proper curing and placement. Measurement and Payment
AutoNDA by SimpleDocs
Test Strip. A test strip shall be placed with job site materials and approved by the Engineer. The weather and time of day, day or night, during the test strip shall be similar to expected conditions during construction. Upon completion of the test strip the Engineer will approve the mixture for proper curing and placement. Measurement and Payment Latex Modified Microsurfacing Type will be measured along the top surface of the completed work, placed and accepted as specified herein. Payment will be made at the contract unit price per square yard for the type specified, which price will be full compensation for all materials including modifiers and additives, emulsion, aggregate, tack coat, labor, tools, equipment, and all other incidentals necessary to complete the work. Payment will be made under: Pay Item Pay Unit Latex Modified Microsurfacing Type Square Yard
Test Strip. At least 14 days prior to production of the HPTO, construct a test strip as specified in 401.03.03.C except for the allowance to continue paving. Submit test strip results to the RE. The RE will analyze the test strip results in conjunction with the ME’s results from the HMA plant to approve the test strip. Do not proceed with production paving until receiving written permission from the RE. If paving HPTO only on a bridge deck, then the test strip is not required.
Test Strip. Construct a test strip of the BDWSC at a location agreed upon with the RE. Ensure that the tack coat or prime coat has been placed as specified in 555.03.01.
Test Strip. Before the rubblization operations begin, the Engineer will designate a test section of approximately 500 feet by 12 feet. The Contractor shall rubblize the test section using varying degrees of energy and/or various striking heights until a procedure is established that will rubblize the pavement to the required extent as contained in these specifications. A 3 foot by 12 foot test pit shall be excavated for the full depth of the rubblized pavement in the middle of the test strip, at a location selected by the Engineer, to determine that the breaker is producing pieces of the specified sizes as contained in these specifications. The rubblized particle sizes shall be checked throughout the entire depth of the pavement. The Engineer may require additional test pits. The test pit material shall be removed from the project and the hole filled using dense graded aggregate base course as determined by the Engineer. The replacement material shall be placed and properly compacted by the Contractor.
Test Strip. The Compaction Xxxxxxx and Engineer will evaluate the densities obtained with the various roller combinations to determine the initial approved rolling procedure on a test strip. The test strip will remain in place as part of the completed work.
AutoNDA by SimpleDocs
Test Strip. Construct a test strip of at least 100 feet in length on the roadway before initial placement commences as specified in 422.03.01.C.

Related to Test Strip

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Dark Fiber 8.1 Subject to the conditions set forth in Section 1 of this Attachment and upon request by CBB, Verizon shall provide CBB with access to unbundled Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF in accordance with, and subject to, the rates, terms and conditions provided in the Pricing Attachment and rates, terms and conditions of Verizon’s applicable Tariffs. Access to unbundled Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF will be provided by Verizon only where existing facilities are available. Access to Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF will be provided in accordance with, but only to the extent required by, Applicable Law. Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF consist of Verizon optical transmission facilities without attached multiplexers, aggregation or other electronics. To the extent Verizon’s Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF contain any lightwave repeaters (e.g., regenerators or optical amplifiers) installed thereon, Verizon shall not remove the same. Except as otherwise required by Applicable Law, the following terms and conditions apply to Verizon's Dark Fiber offerings.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Local Switching Interfaces 4.2.13.1 Deland Actel shall order ports and associated interfaces compatible with the services it wishes to provide as listed in Exhibit A. BellSouth shall provide the following local switching interfaces:

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.