TEST SCHEDULES Clause Samples

TEST SCHEDULES. The administration shall confer with the Association when developing end-of-semester test schedules in an effort to arrive at test schedules mutually agreeable to the parties.
TEST SCHEDULES. (a) The Operator and PNOC-EDC shall agree on test schedules and schedules of Geothermal Fluid requirements for the tests for the Power Plants. The schedules shall take into consideration the operational requirements of PNOC- EDC and NAPOCOR, provided, however, that the Operator shall not be delayed by more than 7 calendar days in his proposed test schedules. (b) In so far as Plants 1,2 and 3 are concerned, the Operator agrees to accept Geothermal fluid for a total period of three (3) months during the commissioning period. Over these three (3) months the Operator, at Operator's request, shall be entitled to two (2) months of Geothermal Fluid supply for plant 3 and two (2) months of Geothermal Fluid supply for Plants 1 and 2.
TEST SCHEDULES. The TSO may oblige the BRP to submit test schedules as part of the conclusion of the contract or as proof of proper schedule management in accordance with Section 5.1 after schedule errors or in the event of a lack of schedule management of a balancing group declared in Annex 1.1 of this contract. The TSO can make corresponding specifications for this. 1. Definition of a power plant breakdown 1.1. A stochastic, technical event that completely or partly interrupts or no longer permits a feed-in. 1.2. Feed-ins are all power plant feed-ins including deliveries or withdrawals via HVDC connections assigned to the balancing group and from pumped storage. 1.3. The “lost power” is the difference between the planned or actual power feed-in into the grid before the stochastic, technical event and the actual power feed-in as a consequence of the stochastic, technical event.