Test Configuration Sample Clauses
Test Configuration. Power consumption of a computer shall be measured and tested from an AC source to the UUT. If the UUT supports Ethernet, it must be connected to an Ethernet network switch capable of the UUT's highest and lowest network speeds. The network connection must be live during all tests.
Test Configuration a. Each test shall be capable of having a unique workflow defined by the LIMS administrator in the system.
b. Each Test shall have the ability to track cost and extended pricing.
c. Tests shall track holding times from either sample date or time between workflow steps.
d. Email alerts shall be able to be system generated based on test workflow events.
e. Tests shall have the capacity to record data for 1 to n number of test parameters.
f. EPA rounding logic shall be capable of being defined uniquely for each parameter within a test.
g. Tests shall be able to be grouped together for routine use that: (1) can be assigned at login and (2) can have unique pricing that is different from the individual tests that comprise the group.
Test Configuration. The test configuration block includes some static aspects related to test component and port types. But the interesting aspect of this block is the possibility of dynamic concurrent testing configurations: • Dynamic instantiation and management of test components • Mappings of test components to abstract test system interfaces • Connections between test component interfaces • Management of test components
Test Configuration. The monitor should be tested as shipped. If it includes any USB hub(s)/Port(s), no devices or an upstream cord should be connected to the hub/ports when the monitor is being tested.
