Terms of Number Portability Sample Clauses

Terms of Number Portability. In the event you are transferring an existing local phone number for use in connection with the Service, the following terms and conditions apply:
AutoNDA by SimpleDocs

Related to Terms of Number Portability

  • Number Portability Each Party shall ensure that suppliers of public telecommunications networks or services in its territory provide number portability, to the extent technically and economically feasible, in a reasonable period of time and on terms and conditions that are reasonable and non-discriminatory.

  • Local Number Portability The Permanent Number Portability (PNP) database supplies routing numbers for calls involving numbers that have been ported from one local service provider to another. PNP is currently being worked in industry forums. The results of these forums will dictate the industry direction of PNP. BellSouth will provide access to the PNP database at rates, terms and conditions as set forth by BellSouth and in accordance with an effective FCC or Commission directive.

  • Data Portability Operator shall, at the request of the LEA, make Data available including Pupil Generated Content in a readily accessible format.

  • Openness and Transparency Contractor shall make available to individuals applicable policies, procedures, and technologies that directly affect such individuals and/or their Protected Health Information and Personally Identifiable Information.

  • Portability The Employer will credit an Employee additional Personal Leave credits up to those held at the date that Employee ceased previous employment provided that:

  • Long Description (If Applicable Training to provide the knowledge, skills and abilities needed as a result of agency mission, policies, or procedures. . Training to acquire the knowledge, skills and abilities needed as a result of assignment to new duties and responsibilities when such training is not part of a planned, career development program (e.g., training provided to a staffing specialist who has been newly assigned to a position involving classification duties).

  • Data Universal Number System (DUNS) number Requirement Grantee will provide their valid DUNS number contemporaneous with execution of this Agreement.

  • General Description Employer shall provide Employee with the compensation, incentives, benefits, and business expense reimbursement specified elsewhere in this agreement.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • General Description of Services The A-E will be contacted by COUNTY Project Management staff on an “as-needed” basis as projects arise to provide A-E for professional services. Requirements will be discussed by both Parties and A-E shall prepare a written Scope Statement that will include the specific work to be performed, including the costs and time required to complete the project/task. Orange COUNTY Project Management staff will then review the A-E’s Scope Statement, proceed with negotiation of task costs and when satisfied, issue a Contract Task Order (CTO) against this CONTRACT. The A-E shall serve as lead of a design team that may include other construction design professionals working together to ensure that the original design is carried through to the finished product, with no alterations in materials or design that would lead to safety issues or compromise the quality of the building or building component. Other team members who may be retained by the lead to support a project as a consultant may include but are not limited to landscape architects, lighting designers, data consultants, security consultants, controls engineers, commissioning consultants, traffic engineers, surveyors, estimators, special inspection, etc. The A-E shall be responsible for the preparation of comprehensive building assessments, designs, drawings, specifications, cost estimates, and reports within the scope of the Contract Task Order (CTO). In the preparation of construction drawings and specification, the A-E shall also responsible for:

Time is Money Join Law Insider Premium to draft better contracts faster.