Technical Quotation Submission Content Clause Samples

The Technical Quotation Submission Content clause defines the specific information and documentation that a bidder must include when submitting a technical quotation in response to a procurement or tender process. Typically, this clause outlines requirements such as detailed technical specifications, compliance statements, project methodologies, and evidence of relevant experience or qualifications. By clearly specifying what must be provided, the clause ensures that all submissions are complete and comparable, thereby facilitating a fair evaluation process and reducing the risk of misunderstandings or incomplete bids.
Technical Quotation Submission Content. Each Quoter shall submit a quotation, which consists of two (2) electronic volumes, as described below: Tab A Quotation Cover/Transmittal Letter (limit 3 pages) 1 Tab B Technical Quotation (limit 35 pages, divided below by Factors) 1 Tab B Demonstrated Prior Experience & Reference Checks (10 pages) 1 Tab B Technical Understanding & Capabilities (15 pages) 1 Tab C Management Approach (10 pages) 1 Volume II – Business & Pricing Tab A Quotation Cover/Transmittal letter; SF18 “Request for Quotation”; SF30 “Amendment(s)” if any; GSA Pricing Schedule; HSAR Clause 3052.209-70 (f) Disclosure; and HSAR Provision 3052.209-72(c) Disclosure. 2 Tab B Completed Pricing TableAttachment 2 2 Tab C Completed Pricing ModelAttachment 3 2 Tab D GSA Teaming Arrangement, if applicable 2 Information contained in each volume shall be complete to the extent that evaluation of one volume may be accomplished independently of, and concurrently with, evaluation of the other.
Technical Quotation Submission Content. Each Quoter shall submit a quotation, which consists of two (2) electronic volumes, as described below: Tab A Quotation Cover/Transmittal Letter (limit 3 pages) Tab B Technical Quotation (limit 40 pages)

Related to Technical Quotation Submission Content

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.

  • Application Submission Submissions of a rental application does not guarantee approval or acceptance. It does not bind us to accept the application or to sign a Lease contact.

  • Updated Information Submission by Developer The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Standard Large Facility Interconnection Procedures. It shall also include any additional information provided to Connecting Transmission Owner for the Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Developer’s data is different from what was originally provided to Connecting Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Connecting Transmission Owner, NYISO and Developer and this difference may be reasonably expected to affect the other Parties’ facilities or the New York State Transmission System, but does not require the submission of a new Interconnection Request, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. Such studies will provide an estimate of any additional modifications to the New York State Transmission System, Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades based on the actual data and a good faith estimate of the costs thereof. The Developer shall not begin Trial Operation until such studies are completed. The Developer shall be responsible for the cost of any modifications required by the actual data, including the cost of any required studies.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will ▇▇▇▇ ▇▇▇▇▇▇▇ Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Public Posting of Approved Users’ Research Use Statement The PI agrees that information about themselves and the approved research use will be posted publicly on the dbGaP website. The information includes the PI’s name and Requester, project name, Research Use Statement, and a Non-Technical Summary of the Research Use Statement. In addition, and if applicable, this information may include the Cloud Computing Use Statement and name of the CSP or PCS. Citations of publications resulting from the use of controlled-access datasets obtained through this DAR may also be posted on the dbGaP website.