Common use of SURFACE WATER MANAGEMENT Clause in Contracts

SURFACE WATER MANAGEMENT. Suitable techniques shall be employed for erosion and sedimentation control during the operation of the Recycling drop off area. Surface water systems shall be designed to accommodate a 100 year storm event for duration appropriate for the size of the drainage requirements. Surface water management and control systems shall be provided to: Control the run on of surface waters onto the working areas of the Recycling drop off area, Collect and control run off waters from Recycling drop off area, and Reduce potential erosion in order to protect the integrity of the area in which work is being preformed. The system shall include but not limited to: Diversion channels appropriately placed to keep surface water away from the working area of the site. Appropriate ditching and sedimentation ponds for management of storm water ; (a) Construction of collection ponds in a way to minimize the collection of water in the compost area. (b) Surface/Storm water may accumulate with in the active area which may need to be discharged appropriately and meet discharge criteria.

Appears in 1 contract

Sources: Operations Manual

SURFACE WATER MANAGEMENT. Suitable techniques shall be employed for erosion and sedimentation control during the operation of the Recycling drop off areaCompost facility. Surface water systems shall be designed to accommodate a 100 year storm event for duration appropriate for the size of the drainage requirements. Surface water management and control systems shall be provided to: : (a) Control the run on of surface waters onto the working areas of the Recycling drop off area, compost site, (b) Collect and control run off waters from Recycling drop off areacompost site, and and (c) Reduce potential erosion in order to protect the integrity of the area in which work is being preformed. The system shall include but not limited to: Diversion channels appropriately placed to keep surface water away from the working area of the site. . (a) Appropriate ditching and sedimentation ponds for management of storm water ; (ab) Construction of collection ponds in a way to minimize the collection of water in the compost area. (bc) Surface/Storm water may accumulate with in the active area which may need to be discharged appropriately and meet discharge criteriacriteria when quantities of water are too abundant to re-apply onto windrows of the compost area.

Appears in 1 contract

Sources: Operations Manual