SUBSURFACE UTILITY ENGINEERING. (“SUE”). The Professional shall perform SUE as described herein. 4.2.1. The Professional shall provide SUE “Quality Level B” utility locates at select locations along the alignment of the pipeline. Level B includes two-dimensional horizontal information obtained through the application and interpretation of non-destructive surface geophysical methods providing horizontal positioning of subsurface utilities to within approximately one (1) foot. 4.2.2. The Professional shall perform SUE “Quality Level A” for up to fifteen (15) pothole locations. Level A includes physically locating the actual utility – often by ‘potholing.’ Once the utility is potholed it is located horizontally and vertically by survey measurements. This location is typically to the top of the pipe and shall be noted on the design plans. 4.2.3. The Professional shall provide coordination for utility locates/clearance and permitting required to conduct SUE potholes. 4.2.4. The Professional shall provide traffic control, depending on the directed dig site locations.
Appears in 1 contract
Sources: Professional Services
SUBSURFACE UTILITY ENGINEERING. (“SUE”). The Professional shall perform SUE as described herein.
4.2.1. The Professional shall provide SUE “Quality Level B” utility locates at select locations along the alignment of the pipeline. Level B includes two-dimensional horizontal information obtained through the application and interpretation of non-destructive surface geophysical methods providing horizontal positioning of subsurface utilities to within approximately one (1) foot.
4.2.2. The Professional shall perform SUE “Quality Level A” for up to fifteen twelve (1512) pothole locations. Level A includes physically locating the actual utility – often by ‘potholing.’ Once the utility is potholed it is located horizontally and vertically by survey measurements. This location is typically to the top of the pipe and shall be noted on the design plans.
4.2.3. The Professional shall provide coordination for all utility locates/clearance and permitting required to conduct SUE potholes.
4.2.4. The Professional shall provide traffic controlcontrol for up to three (3) lane closures, depending on the directed dig site locations.
Appears in 1 contract
Sources: Professional Services
SUBSURFACE UTILITY ENGINEERING. (“SUE”). The Professional shall perform SUE as described herein.
4.2.1. The Professional shall provide SUE “Quality Level B” utility locates at select locations along the alignment of the pipeline. Level B includes two-dimensional horizontal information obtained through the application and interpretation of non-destructive surface geophysical methods providing horizontal positioning of subsurface utilities to within approximately one (1) foot.
4.2.2. The Professional shall perform SUE “Quality Level A” for up to fifteen twenty (1520) pothole locations. Level A includes physically locating the actual utility – often by ‘potholing.’ Once the utility is potholed it is located horizontally and vertically by survey measurements. This location is typically to the top of the pipe and shall be noted on the design plans.
4.2.3. The Professional shall provide coordination for utility locates/clearance and permitting required to conduct SUE potholes.
4.2.4. The Professional shall provide traffic control, depending on the directed dig site locations.