Common use of STORM SEWER Clause in Contracts

STORM SEWER. Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following:  all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase  benchmarks, including TBM set with preliminary survey  center of inside face on Type 1/1A curb inlets; center of high edge on Type 2 curb inlets  for skewed inlets typically in intersection radii, or not parallel to baseline – center of curb inlet AND center of inside face on Type 1/1A curb inlets; center of high edge on Type 2 curb inlets  end of end section, at CL of pipe  center, end of pipe at outside face of headwall; if headwall not perpendicular to pipe, each corner of headwall at outside face  center of all drop inlets, manholes, and other structures  center of RCBC at each end (outside face of hubguard); if box rotated, each corner, outside face

Appears in 10 contracts

Samples: Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

STORM SEWER. Provide a standard bubble map, as part of the ofthe plans, showing locations of numbered ofnumbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase benchmarks, including TBM set with preliminary survey center of inside ofinside face on Type 1/1A I/ IA curb inlets; center of high ofhigh edge on Type 2 curb inlets for skewed inlets typically in intersection radii, or not parallel to baseline - center of curb ofcurb inlet AND center of inside ofinside face on Type 1/1A 1/lA curb inlets; center of high ofhigh edge on Type 2 curb inlets end of end ofend section, at CL of pipe  ofpipe • center, end of pipe ofpipe at outside face of headwallofheadwall; if headwall ifheadwall not perpendicular to pipe, each corner xxxxx of headwall at outside face center of all ofall drop inlets, manholes, and other structures center of RCBC ofRCBC at each end (outside face of hubguardofhubguard); if box ifbox rotated, each cornerxxxxx, outside face

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

STORM SEWER. Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following:  all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase  benchmarks, including TBM set with preliminary survey  center of inside face on Type 1/1A curb inlets; center of high edge on Type 2 curb inlets  for skewed inlets typically in intersection radii, or not parallel to baseline – center of curb inlet AND center of inside face on Type 1/1A curb inlets; center of high edge on Type 2 curb inlets  end of end section, at CL of pipe  center, end of pipe at outside face of headwall; if headwall not perpendicular to pipe, each corner of headwall at outside face  center of all drop inlets, manholes, and other structures  center of RCBC at each end (outside face of hubguard); if box rotated, each corner, outside face

Appears in 1 contract

Samples: Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.