Storage overhead analysis Sample Clauses

Storage overhead analysis. Storage overhead must be taken into consideration to design efficient security schemes in the context of IoT. Thus, we study the storage cost at specific moments in the sensor node as a constrained object. First, after the registration phase, the sensor node stores (Idi, MSIdi, Xi) which means 40 bytes. Second, after the authentication phase, we have two cases: • Case ‘not in the area’: the sensor node has in its storage (Idi, MSIdi, Xi, N, Z, S, W) which means 72 bytes. • Case ‘in the area’: the sensor node has in its storage (Idi, MSIdi, Xi, N, M) which means 56 bytes. Third, at the end of the key establishment phase: • Case ‘not in the area’: the sensor node stores (Idi, MSIdi, Xi, N, Z, S, W, K1, K2, K) that consumes 104 bytes, and it is the maximum used storage. • Case ‘in the area’: the sensor node stores (Idi, MSIdi, Xi, N, M, K) that consumes 72 bytes. Finally, after the key establishment phases, the sensor node can delete (N, Z, S, W, K1, K2) in the first case, and (N, M) in the second case. Thus, it stores only 56 bytes (Idi, MSIdi, Xi, K). As a result from the storage overhead analysis of proposed authentication and key agreement scheme, we deduce that the proposed scheme has a very low storage cost which enhances the scheme performance.
AutoNDA by SimpleDocs

Related to Storage overhead analysis

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • DATA COLLECTION AND ANALYSIS The goal of this task is to collect operational data from the project, to analyze that data for economic and environmental impacts, and to include the data and analysis in the Final Report. Formulas will be provided for calculations. A Final Report data collection template will be provided by the Energy Commission. The Recipient shall: • Develop data collection test plan. • Troubleshoot any issues identified. • Collect data, information, and analysis and develop a Final Report which includes: o Total gross project costs. o Length of time from award of bus(es) to project completion. o Fuel usage before and after the project.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • COMPENSATION ANALYSIS After the expiration of the second (2nd) Renewal Term of this Agreement, if any, a Compensation Analysis may be performed. At such time, based on the reported Total Gross Revenue, performance of the Concession, and/or Department’s existing rates for similarly- performing operations, Department may choose to increase the Concession Payment for the following Renewal Term(s), if any.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • Testing/Trouble Reporting 1.15.1 TWTC will be responsible for testing and isolating troubles on Network Elements. TWTC must test and isolate trouble to the AT&T network before reporting the trouble to the Network Elements Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from AT&T at the time of the trouble report, TWTC will be required to provide the results of the TWTC test which indicate a problem on the AT&T network. Version: 4Q06 Standard ICA 11/30/06

  • Inspections and Testing Each Interconnected Entity shall perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Customer Facility with the Transmission System in a safe and reliable manner. Each Interconnected Entity shall have the right, upon advance written notice, to request reasonable additional testing of an Interconnected Entity’s facilities for good cause, as may be in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.