SOFT SURFACE RESTORATION PROCEDURES Clause Samples

SOFT SURFACE RESTORATION PROCEDURES. The Contractor shall furnish the supervision, labor, equipment and material necessary to perform as required the restoration functions of: grading; leveling; clearing of debris; seed bed preparation, and the application of top soil, lime, fertilizer, seed and mulch, as described in the following: Excavation in lawn areas shall be backfilled with suitable excavated material. Installed compacted in 12 inch lifts to mum of 85% compaction.
SOFT SURFACE RESTORATION PROCEDURES. The Contractor shall furnish the supervision, labor, equipment and material necessary to perform as required the restoration functions of: grading; leveling; clearing of debris; seed bed preparation, and the application of top soil, lime, fertilizer, seed and mulch, as described in the following: Excavation in lawn areas shall be backfilled with suitable excavated material. Installed compacted in 12 inch lifts to achieve a minimum of 85% compaction. All excavations in lawn areas not receiving restoration within two (2) weeks of backfilling shall be left within one (1) inch of final finished grade. All debris from excavation and backfilling operations (rocks, roots branches, etc.) larger than three (3) inches shall be removed and disposed of by the Contractor at the time of backfilling. SEED BED PREPARATIONS