Common use of Safety and Health Reports Clause in Contracts

Safety and Health Reports. Accidents Please describe all Project-related accidents reported since the previous report. Work stoppages Please describe all Project-related work stoppages from that occurred since the previous report. Please describe the effect of work stoppages on the Project schedule. Certification I, _____________, on behalf of and as an authorized representative of [_________], do hereby certify that any and all information contained in this Seller’s Monthly Construction Progress Report is true and accurate, and reflects, to the best of my knowledge, the current status of the construction of the Units as of the date specified below. By: _________________________ Name: _______________________ Title: ________________________ Date: ________________________ APPENDIX IV PROJECT DESCRIPTION INCLUDING DESCRIPTION OF SITE FACILITY DESCRIPTION Facility name: Facility Site name: Facility physical address: Total number of Units at the facility (committed and not committed to Buyer) _________________________________________ Technology Type: __________________________ Substation: The term “Site” as defined in the Agreement means the following parcel description upon which the facility is located: The nameplate capacity of the Project is ____________. The Units utilized as generation assets as part of the Project is described below: [INSERT MAP] APPENDIX V DELIVERY TERM CONTRACT QUANTITY SCHEDULE [To be completed by Seller] Contract Year Contract Quantity APPENDIX VI COMMERCIAL OPERATION CERTIFICATION PROCEDURE [To be developed by Buyer and Seller and to include Form Certification set forth in Appendix VI Attachment A] APPENDIX VI - Attachment A FORM OF CERTIFICATION This certification (“Certification”) is delivered by _________ (“Seller”) to Pacific Gas and Electric Company (“Buyer”) in accordance with the terms of that certain Power Purchase Agreement dated ________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement. Seller hereby certifies and represents to Buyer the following: [To be developed by Buyer and Seller] APPENDIX VII GEP DAMAGES CALCULATION In accordance with the provisions in Section 3.1(e)(ii), GEP Damages means the liquidated damages payment due by Seller to Buyer, calculated as follows: [(A-B)X(C-D)] Where: A = the Guaranteed Energy Production for the Performance Measurement Period, in MWh B = Sum of Delivered Energy over the Performance Measurement Period, in MWh C= Replacement Price for the Performance Measurement Period, in $/MWh, reflecting the sum of (a) the simple average of the simple average of the Day Ahead Integrated Forward Market hourly price, as published by the CAISO, for the Existing Zone Generation Trading Hub, in which the Project resides, plus (b) $50/MWh D = the unweighted Contract Price specified in Section 4.1 for the Performance Measurement Period, in $/MWh The Parties agree that in the above calculation of GEP Damages, the result of “(C-D)” shall not be less than $20/MWh. and shall be no greater than seventy five percent (75%) of the Contract Price (in $/MWh) set forth in Section 4.1. APPENDIX VIII NOTIFICATION REQUIREMENTS FOR AVAILABLE CAPACITY AND PROJECT OUTAGES NOTIFICATION REQUIREMENTS FOR START-UP AND SHUTDOWN Prior to paralleling to or after disconnecting from the electric system, ALWAYS follow your balancing authority rules and notify your designated balancing authority control center as follows: Call the balancing authority control center to parallel before any start-up Call the balancing authority control center again with parallel time after start-up. Call the balancing authority control center after any separation and report the separation time as well as the date and time estimate for return to service.

Appears in 4 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

Safety and Health Reports. Accidents Please describe all Project-related accidents reported since Any work stoppage from the previous report. calendar month: Work stoppages Please describe all stoppage impact on construction of the Project-related work stoppages from that occurred since the previous report. Please describe the effect of work stoppages on the Project schedule. Certification : I, _____________, on behalf of and as an authorized representative of [_________]of, do hereby certify that any and all information contained in this Sellerthe attached ________’s Monthly Construction Progress Report is true and accurate, and reflects, to the best of my knowledge, the current status of the construction of the Units Project as of the date specified below. By: :__________________________ Name: :________________________ Title: :_________________________ Date: :_________________________ APPENDIX IV 7 TESTING PROTOCOLS [DISCUSS WHETHER TESTING IS ONLY ON A PROJECT DESCRIPTION INCLUDING DESCRIPTION OF SITE FACILITY DESCRIPTION Facility name: Facility Site name: Facility physical address: Total number LEVEL OR IS ALSO ON A GENERATING UNIT BASIS] Seller shall develop detailed test procedures for the Commercial Operation Tests and for the Contract Capacity, Heat Rate, and Ancillary Services Testing and submit them to Buyer for review and approval prior to use. Each procedure shall define the object, scope, criteria, and methods (including correction curves and an analysis of Units test uncertainty) applicable to the test. Test corrections shall include ambient temperature, relative humidity, barometric pressure, and natural gas fuel conditions. The test procedures shall be submitted at least four (4) months prior to the facility commencement of testing. Buyer shall review and comment on proposed test procedures within thirty (committed 30) calendar days of receipt. Seller and not committed Buyer shall cooperate to schedule Commercial Operation Tests at reasonable times in light of Seller's need to achieve Commercial Operation and Buyer) _________________________________________ Technology Type: __________________________ Substation: ’s need to manage delivery of test energy to load. The term “Site” as defined Contract Capacity, Heat Rate, and Ancillary Services Testing shall be conducted at mutually agreed times prior to June of each calendar year after the Initial Delivery Date. Buyer reserves the right to witness the tests. Project instrumentation will be used during the performance tests whenever practical. The accuracy of Project instrumentation shall be verified within 30 days of the performance of any tests. No corrections for equipment degradation or test tolerances will be included in the Agreement means the following parcel description upon which the facility is located: The nameplate capacity test results. Certified test reports for all tests shall be submitted to Buyer for review and approval as a condition of the Project is ____________reaching Commercial Operation status. The Units utilized as generation assets as part Commercial Operation Tests required pursuant to Section 7.2 shall consist of the Project is described belowfollowing tests: [INSERT MAP] APPENDIX V DELIVERY TERM CONTRACT QUANTITY SCHEDULE [To be completed by Seller] Contract Year Contract Quantity APPENDIX VI COMMERCIAL OPERATION CERTIFICATION PROCEDURE [To be developed by Buyer and Seller and to include Form Certification set forth in Appendix VI Attachment A] APPENDIX VI - Attachment A FORM OF CERTIFICATION This certification (“Certification”) is delivered by _________ (“Seller”) to Pacific Gas and Electric Company (“Buyer”) in accordance with the terms of that certain Power Purchase Agreement dated ________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement. Seller hereby certifies and represents to Buyer the following: [To be developed by Buyer and Seller] APPENDIX VII GEP DAMAGES CALCULATION In accordance with the provisions in Section 3.1(e)(ii), GEP Damages means the liquidated damages payment due by Seller to Buyer, calculated as follows: [(A-B)X(C-D)] Where: A = the Guaranteed Energy Production for the Performance Measurement Period, in MWh B = Sum of Delivered Energy over the Performance Measurement Period, in MWh C= Replacement Price for the Performance Measurement Period, in $/MWh, reflecting the sum of (a) the simple average of the simple average of the Day Ahead Integrated Forward Market hourly price, as published by the CAISO, for the Existing Zone Generation Trading Hub, in which the Project resides, plus (b) $50Capacity Test Heat Rate Test Reliability/MWh D = the unweighted Contract Price specified in Section 4.1 for the Performance Measurement Period, in $/MWh The Parties agree that in the above calculation of GEP Damages, the result of “(C-D)” shall not be less than $20/MWh. and shall be no greater than seventy five percent (75%) of the Contract Price (in $/MWh) set forth in Section 4.1. APPENDIX VIII NOTIFICATION REQUIREMENTS FOR AVAILABLE CAPACITY AND PROJECT OUTAGES NOTIFICATION REQUIREMENTS FOR START-UP AND SHUTDOWN Prior to paralleling to or after disconnecting from the electric system, ALWAYS follow your balancing authority rules and notify your designated balancing authority control center as follows: Call the balancing authority control center to parallel before any startAvailability Test Ancillary Services Tests Start-up Call the balancing authority control center again with parallel time after start-up. Call the balancing authority control center after any separation and report the separation time as well as the date and time estimate for return to service.Time Test Ramp Rate Test Generator Capability Test

Appears in 1 contract

Samples: Power Purchase Tolling Agreement

Safety and Health Reports. Accidents Please describe all Project-related accidents reported since Any work stoppage from the previous report. calendar month: Work stoppages Please describe all stoppage impact on construction of the Project-related work stoppages from that occurred since the previous report. Please describe the effect of work stoppages on the Project schedule. Certification : I, _____________, on behalf of and as an authorized representative of [_________]of, do hereby certify that any and all information contained in this Sellerthe attached ________’s Monthly Construction Progress Report is true and accurate, and reflects, to the best of my knowledge, the current status of the construction of the Units Project as of the date specified below. By: :__________________________ Name: :________________________ Title: :_________________________ Date: :_________________________ APPENDIX IV 7 TESTING PROTOCOLS [DISCUSS WHETHER TESTING IS ONLY ON A PROJECT DESCRIPTION INCLUDING DESCRIPTION OF SITE FACILITY DESCRIPTION Facility name: Facility Site name: Facility physical address: Total number LEVEL OR IS ALSO ON A GENERATING UNIT BASIS] Seller shall develop detailed test procedures for the Commercial Operation Tests and for the Contract Capacity, Efficiency Rate, and Ancillary Services Testing and submit them to Buyer for review and approval prior to use. Each procedure shall define the object, scope, criteria, and methods (including correction curves and an analysis of Units test uncertainty) applicable to the test. Test corrections shall include ambient temperature, relative humidity, and barometric pressure. The test procedures shall be submitted at least four (4) months prior to the facility commencement of testing. Buyer shall review and comment on proposed test procedures within thirty (committed 30) calendar days of receipt. Seller and not committed Buyer shall cooperate to schedule Commercial Operation Tests at reasonable times in light of Seller's need to achieve Commercial Operation and Buyer) _________________________________________ Technology Type: __________________________ Substation: ’s need to manage delivery of test energy to load. The term “Site” as defined Contract Capacity, Efficiency Rate, and Ancillary Services Testing shall be conducted at mutually agreed times prior to June of each calendar year after the Initial Delivery Date. Buyer reserves the right to witness the tests. Project instrumentation will be used during the performance tests whenever practical. The accuracy of Project instrumentation shall be verified within 30 days of the performance of any tests. No corrections for equipment degradation or test tolerances will be included in the Agreement means the following parcel description upon which the facility is located: The nameplate capacity test results. Certified test reports for all tests shall be submitted to Buyer for review and approval as a condition of the Project is ____________reaching Commercial Operation status. The Units utilized as generation assets as part Commercial Operation Tests required pursuant to Section 7.2 shall consist of the Project is described belowfollowing tests: [INSERT MAP] APPENDIX V DELIVERY TERM CONTRACT QUANTITY SCHEDULE [To be completed by Seller] Contract Year Contract Quantity APPENDIX VI COMMERCIAL OPERATION CERTIFICATION PROCEDURE [To be developed by Buyer and Seller and to include Form Certification set forth in Appendix VI Attachment A] APPENDIX VI - Attachment A FORM OF CERTIFICATION This certification (“Certification”) is delivered by _________ (“Seller”) to Pacific Gas and Electric Company (“Buyer”) in accordance with the terms of that certain Power Purchase Agreement dated ________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement. Seller hereby certifies and represents to Buyer the following: [To be developed by Buyer and Seller] APPENDIX VII GEP DAMAGES CALCULATION In accordance with the provisions in Section 3.1(e)(ii), GEP Damages means the liquidated damages payment due by Seller to Buyer, calculated as follows: [(A-B)X(C-D)] Where: A = the Guaranteed Energy Production for the Performance Measurement Period, in MWh B = Sum of Delivered Energy over the Performance Measurement Period, in MWh C= Replacement Price for the Performance Measurement Period, in $/MWh, reflecting the sum of (a) the simple average of the simple average of the Day Ahead Integrated Forward Market hourly price, as published by the CAISO, for the Existing Zone Generation Trading Hub, in which the Project resides, plus (b) $50Capacity Test Efficiency Rate Test Reliability/MWh D = the unweighted Contract Price specified in Section 4.1 for the Performance Measurement Period, in $/MWh The Parties agree that in the above calculation of GEP Damages, the result of “(C-D)” shall not be less than $20/MWh. and shall be no greater than seventy five percent (75%) of the Contract Price (in $/MWh) set forth in Section 4.1. APPENDIX VIII NOTIFICATION REQUIREMENTS FOR AVAILABLE CAPACITY AND PROJECT OUTAGES NOTIFICATION REQUIREMENTS FOR START-UP AND SHUTDOWN Prior to paralleling to or after disconnecting from the electric system, ALWAYS follow your balancing authority rules and notify your designated balancing authority control center as follows: Call the balancing authority control center to parallel before any startAvailability Test Ancillary Services Tests Start-up Call the balancing authority control center again with parallel time after start-up. Call the balancing authority control center after any separation and report the separation time as well as the date and time estimate for return to service.Time Test Ramp Rate Test Generator Capability Test

Appears in 1 contract

Samples: System Power Purchase Tolling Agreement

Safety and Health Reports. Accidents Please describe all ProjectFacility-related accidents reported since the previous report. Work stoppages Please describe all ProjectFacility-related work stoppages from that occurred since the previous report. Please describe the effect of work stoppages on the Project Facility schedule. Certification I, _____________, on behalf of and as an authorized representative of [_______________], do hereby certify that any and all information contained in this Seller’s 's Monthly Construction Progress Report is true and accurate, and reflects, to the best of my knowledge, the current status of the construction of the Units Facility as of the date specified below. By: _________________________ Name: _______________________ Title: ________________________ Date: ________________________ APPENDIX IV PROJECT DESCRIPTION INCLUDING DESCRIPTION OF SITE FACILITY DESCRIPTION Facility name: Facility Site name: Facility physical address: Total number of Units at the facility (committed and not committed to Buyer) __________:_______________________________ Technology Type: Name:_____________________________ Substation: The term “Site” as defined in the Agreement means the following parcel description upon which the facility is located: The nameplate capacity of the Project is Title:____________. The Units utilized as generation assets as part of the Project is described below: [INSERT MAP] APPENDIX V DELIVERY TERM CONTRACT QUANTITY SCHEDULE [To be completed by Seller] Contract Year Contract Quantity APPENDIX VI COMMERCIAL OPERATION CERTIFICATION PROCEDURE [To be developed by Buyer and Seller and to include Form Certification set forth in Appendix VI Attachment A] APPENDIX VI - Attachment A FORM OF CERTIFICATION This certification (“Certification”) is delivered by __________________ (“Seller”) to Pacific Gas and Electric Company (“Buyer”) in accordance with the terms of that certain Power Purchase Agreement dated Date:______________________________ ATTACHMENT T ON-LINE ACCEPTANCE TEST GENERAL CRITERIA (“Agreement”See definition of On-Line Acceptance Test in Article 1 (Definitions)) [THIS ATTACHMENT MAY BE MODIFIED BASED ON THE TYPE AND DESIGN OF THE FACILITY] [NOTE: THE ON-LINE ACCEPTANCE TEST MAY INCLUDE THE CAPACITY TEST] Final test criteria and procedures shall be agreed upon by Company and between Seller no later than thirty (30) Days prior to conducting the On-Line Acceptance Test in accordance Good Engineering and Buyer. All capitalized Operating Practices and with the terms used in of this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement. Seller hereby certifies and represents to Buyer The On-Line Acceptance Test shall, at a minimum, determine the following: [To be developed by Buyer and Seller] APPENDIX VII GEP DAMAGES CALCULATION In accordance Facility’s compliance with the provisions in Section 3.1(e)(ii), GEP Damages means the liquidated damages payment due by Seller to Buyer, calculated as follows: [(A-B)X(C-D)] Where: A = the Guaranteed Energy Production for the Performance Measurement Period, in MWh B = Sum of Delivered Energy over the Performance Measurement Period, in MWh C= Replacement Price for the Performance Measurement Period, in $/MWh, reflecting the sum of (a) the simple average of the simple average of the Day Ahead Integrated Forward Market hourly price, as published by the CAISO, for the Existing Zone Generation Trading Hub, in which the Project resides, plus (b) $50/MWh D = the unweighted Contract Price specified in Section 4.1 for the Performance Measurement Period, in $/MWh The Parties agree that in the above calculation of GEP Damages, the result of “(C-D)” shall not be less than $20/MWh. and shall be no greater than seventy five percent (75%) of the Contract Price (in $/MWh) set forth in Section 4.1. APPENDIX VIII NOTIFICATION REQUIREMENTS FOR AVAILABLE CAPACITY AND PROJECT OUTAGES NOTIFICATION REQUIREMENTS FOR START-UP AND SHUTDOWN Prior to paralleling to or after disconnecting from the electric system, ALWAYS follow your balancing authority rules and notify your designated balancing authority control center as follows: Call the balancing authority control center to parallel before any start-up Call the balancing authority control center again with parallel time after start-up. Call the balancing authority control center after any separation and report the separation time as well as the date and time estimate for return to service.following requirements:

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs

Safety and Health Reports. Accidents Please describe all Project-related accidents reported since the previous report. Work stoppages Please describe all Project-related work stoppages from that occurred since the previous report. Please describe the effect of work stoppages on the Project schedule. Certification I, _____________, on behalf of and as an authorized representative of [_______________], do hereby certify that any and all information contained in this Seller’s Monthly Construction Progress Report is true and accurate, and reflects, to the best of my knowledge, the current status of the construction of the Units as of the date specified below. By: :_______________________________ Name: :_____________________________ Title: :______________________________ Date: :______________________________ APPENDIX IV PROJECT DESCRIPTION INCLUDING DESCRIPTION OF SITE FACILITY DESCRIPTION Facility name: ______________________________________________________ Facility Site name: __________________________________________________ Facility physical address: _____________________________________________ Total number of Units at the facility (committed and not committed to Buyer) ________________________________________________ Technology Type: _____________________________________________ Substation: The term “Site” as defined in the Agreement means the following parcel description upon which the facility is located: The nameplate capacity of the Project is ______________. The Units utilized as generation assets as part of the Project is described below: [INSERT MAP] APPENDIX V DELIVERY TERM CONTRACT QUANTITY SCHEDULE [To be completed by Seller] Contract Year Contract Quantity [Use this version of Appendix VI for As-Available Product only] APPENDIX VI COMMERCIAL OPERATION CERTIFICATION PROCEDURE [To be developed by Buyer Xxxxx and Seller and to include Form Certification set forth in Appendix VI Attachment A] [Use this version of Appendix VI for As-Available Product only] APPENDIX VI - Attachment A FORM OF CERTIFICATION This certification (“Certification”) is delivered by _________ (“Seller”) to Pacific Gas and Electric Company (“Buyer”) in accordance with the terms of that certain Power Purchase Agreement dated ________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement. Seller hereby certifies and represents to Buyer the following: [To be developed by Buyer Xxxxx and Seller] [Use this version of Appendix VI for Baseload, Peaking or Dispatchable Product only] APPENDIX VI COMMERCIAL OPERATION CERTIFICATION PROCEDURE AND PROCEDURE FOR SUBSEQUENT CAPACITY TESTING [To be developed by Xxxxx and Seller] “Capacity Test” – to be defined. APPENDIX VII GEP DAMAGES CALCULATION In accordance with the provisions in Section 3.1(e)(ii), GEP Damages means the liquidated damages payment due by Seller to Buyer, calculated as follows: [(A-B)X(C-A – B) X (C – D)] Where: A = the Guaranteed Energy Production for the Performance Measurement Period, in MWh B = Sum of Delivered Energy over the Performance Measurement Period, in MWh C= Replacement Price for the Performance Measurement Period, in $/MWh, reflecting the sum of (a) the simple average of the simple average of the Day Ahead Integrated Forward Market hourly price, as published by the CAISO, for the Existing Zone Generation Trading Hub, in which the Project PNode resides, plus (b) $50/MWh D = the unweighted Contract Price specified in Section 4.1 for the Performance Measurement Period, in $/MWh The Parties agree that in the above calculation of GEP Damages, the result of "(C-D)" shall not be less than $20/MWh. and shall be no greater than seventy five percent (75%) of the Contract Price ([Short Term Offers: Sellers to revise in $/MWh) set forth accordance with instructions in Section 4.1. 3.1(e)] APPENDIX VIII NOTIFICATION REQUIREMENTS FOR AVAILABLE CAPACITY AND PROJECT OUTAGES NOTIFICATION REQUIREMENTS FOR START-UP AND SHUTDOWN Prior to paralleling to or after disconnecting from the electric system, ALWAYS follow your balancing authority rules and notify your designated balancing authority control center as follows: Call the balancing authority control center to parallel before any start-up Call the balancing authority control center again with parallel time after start-up. Call the balancing authority control center after any separation and report the separation time as well as the date and time estimate for return to service.OUTAGES

Appears in 1 contract

Samples: Consent and Agreement

Safety and Health Reports. Accidents Please describe all Project-related accidents reported since the previous report. Work stoppages Please describe all Project-related work stoppages from that occurred since the previous report. Please describe the effect of work stoppages on the Project schedule. Certification I, _____________, on behalf of and as an authorized representative of [_______________], do hereby certify that any and all information contained in this Seller’s Monthly Construction Progress Report is true and accurate, and reflects, to the best of my knowledge, the current status of the construction of the Units as of the date specified below. By: :_______________________________ Name: :_____________________________ Title: :______________________________ Date: :______________________________ APPENDIX IV PROJECT DESCRIPTION INCLUDING DESCRIPTION OF SITE FACILITY DESCRIPTION Facility name: ______________________________________________________ Facility Site name: __________________________________________________ Facility physical address: _____________________________________________ Total number of Units at the facility (committed and not committed to Buyer) ________________________________________________ Technology Type: _____________________________________________ Substation: The term “Site” as defined in the Agreement means the following parcel description upon which the facility is located: The nameplate capacity of the Project is ______________. The Units utilized as generation assets as part of the Project is described below: [INSERT MAP] APPENDIX V DELIVERY TERM CONTRACT QUANTITY SCHEDULE [To be completed by Seller] Contract Year Contract Quantity APPENDIX VI CONSTRUCTION START AND COMMERCIAL OPERATION CERTIFICATION PROCEDURE FORMS AND PROCEDURES Appendix VI-1: CONSTRUCTION START FORM OF CERTIFICATION [To be developed by Buyer Use for BOTH As‑Available and Seller Baseload, Peaking or Dispatchable Product] Appendix VI-2: COMMERICAL OPERATION CERTIFICATION FORM AND PROCEDURES [Use the version designated for either As‑Available or Baseload, Peaking or Dispatchable Product] [Use this Appendix VI—1 for BOTH As-Available and to include Form Certification set forth in Appendix VI Attachment ABaseload, Peaking and Dispatchable Products] APPENDIX VI - Attachment A VI–1 CONSTRUCTION START FORM OF CERTIFICATION This certification (“Certification”) of the Construction Start Date is delivered by _________ (“Seller”) to Pacific Gas and Electric Company (“Buyer”) in accordance with the terms of that certain Power Purchase Agreement dated ________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement. Seller hereby certifies and represents to Buyer the following: [To be developed by Buyer and Seller and signed by a Licensed Professional Engineer] [Use this version of Appendix VI–2 for As-Available Product only] APPENDIX VI–2 COMMERCIAL OPERATION CERTIFICATION PROCEDURE [To be developed by Buyer and Seller and to include Form Certification set forth in Appendix VI-2, Attachment A] [Use this version of Appendix VI–2 for As-Available Product only] APPENDIX VI–2 –Attachment A COMMERCIAL OPERATION FORM OF CERTIFICATION This certification (“Certification”) of Commercial Operation is delivered by _______(“Seller”) to Pacific Gas and Electric Company (“Buyer”) in accordance with the terms of that certain Power Purchase Agreement dated _______ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement. Seller hereby certifies and represents to Buyer the following: [To be developed by Buyer and Seller and signed by a Licensed Professional Engineer] [Use this version of Appendix VI–2 for Baseload, Peaking or Dispatchable Product only] APPENDIX VI–2 COMMERCIAL OPERATIONCERTIFICATION PROCEDURE AND PROCEDURE FOR SUBSEQUENT CAPACITY TESTING [To be developed by Buyer and Seller] “Capacity Test” – to be defined. APPENDIX VII GEP DAMAGES CALCULATION In accordance with the provisions in Section 3.1(e)(ii), GEP Damages means the liquidated damages payment due by Seller to Buyer, calculated as follows: [(A-B)X(C-A – B) X (C – D)] Where: A = the Guaranteed Energy Production for the Performance Measurement Period, in MWh B = Sum of Delivered Energy over the Performance Measurement Period, in MWh C= Replacement Price for the Performance Measurement Period, in $/MWh, reflecting the sum of (a) the simple average of the simple average of the Day Ahead Integrated Forward Market hourly price, as published by the CAISO, for the Existing Zone Generation Trading Hub, in which the Project PNode resides, plus (b) $50/MWh D = the unweighted Contract Price specified in Section 4.1 for the Performance Measurement Period, in $/MWh The Parties agree that in the above calculation of GEP Damages, the result of "(C-D)" shall not be less than $20/MWh. and shall be no greater than seventy five percent (75%) of the Contract Price (in $/MWh) set forth in Section 4.1. APPENDIX VIII NOTIFICATION REQUIREMENTS FOR AVAILABLE CAPACITY AND PROJECT OUTAGES NOTIFICATION REQUIREMENTS FOR START-UP AND SHUTDOWN Prior to paralleling to or after disconnecting from the electric system, ALWAYS follow your balancing authority rules and notify your designated balancing authority control center as follows: Call the balancing authority control center to parallel before any start-up Call the balancing authority control center again with parallel time after start-up. Call the balancing authority control center after any separation and report the separation time as well as the date and time estimate for return to service.VIII

Appears in 1 contract

Samples: Power Purchase Agreement