Reservation and Commitment of HOME Program Funds with Disbursement Schedule Sample Clauses

Reservation and Commitment of HOME Program Funds with Disbursement Schedule. The City hereby and commits to the CMHA, as a subrecipient under the HOME Program, all HOME Program funds heretofore received by the City and not already expended committed, or encumbered, as follows:
AutoNDA by SimpleDocs

Related to Reservation and Commitment of HOME Program Funds with Disbursement Schedule

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Disbursement Generally OEM shall reimburse eligible costs incurred in carrying out the Project, up to the Grant Fund amount provided in Section 3. Reimbursements shall be made by OEM upon approval by OEM of an RFR. Eligible costs are the reasonable and necessary costs incurred by Subrecipient for the Project, in accordance with the Emergency Management Performance Grants guidance and application materials, including without limitation the United States Department of Homeland Security Notice of Funding Opportunity Announcement (NOFO), that are not excluded from reimbursement by OEM, either by this Agreement or by exclusion as a result of financial review or audit. The guidance, application materials and NOFO are available at xxxx://xxx.xxxxxx.xxx/OEM/emresources/Grants/Pages/EMPG.aspx

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20).

  • OFFSET CREDIT/COOPERATION This Contract has been entered into in direct support of LOCKHEED XXXXXX'x international offset programs. All offset benefit credits resulting from this Contract are the sole property of LOCKHEED XXXXXX to be applied to the offset program of its choice. SELLER shall assist LOCKHEED XXXXXX in securing appropriate offset credits from the respective country government authorities.

  • Administrator Allowances and Conditions of Practice 4.1. Creation of New Designations/Positions

  • Lodgement of SWS wage assessment agreement C.6.1 All SWS wage assessment agreements under the conditions of this schedule, including the appropriate percentage of the relevant minimum wage to be paid to the employee, must be lodged by the employer with Fair Work Australia.

  • Non-discrimination Based on National Origin as evidenced by Limited English Proficiency The Contractor agrees to comply with the non-discrimination requirements of Title VI of the Civil Rights Act of 1964, 42 USC Section 2000d, et seq., and with the federal guidelines promulgated pursuant to Executive Order 13166 of 2000, which require that contractors and subcontractors receiving federal funds must assure that persons with limited English proficiency can meaningfully access services. To the extent the Contractor provides assistance to individuals with limited English proficiency through the use of oral or written translation or interpretive services in compliance with this requirement, such individuals cannot be required to pay for such services.

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Teachers with Principal Designations (Effective October 22, 2019, the following repeals and replaces clause 4.4. above)

Time is Money Join Law Insider Premium to draft better contracts faster.