Reactive Power Absorption Clause Samples
Reactive Power Absorption. The Facility shall also be capable of dynamically absorbing 0.23 MVARs from the transmission system for each MW supplied at the 230 kV Interconnection Point during simulations when the Facility is tested at 104% of nominal voltage. Simple Cycle combustion turbines used as peaking generation may be exempted from the MVAR absorption requirements.
Reactive Power Absorption. If EirGrid has agreed with the Service Provider that for this Trading Period a level of Reactive Power (Absorption) shall be made available that is greater than that the contracted level given in this Agreement, then the Contracted Reactive Power (Absorption)6 shall be set equal to this higher level, but in all other cases the 5 Contracted Reactive Power (Production) is the contracted amount of Reactive Power produced by a unit generating at
