Common use of PROPERTY DEDICATION Clause in Contracts

PROPERTY DEDICATION. A. The Developer shall provide a 15-foot wide public water line utility easement for all water lines buried up to 7 feet deep. Easement widths required for locations where lines are more than 7 feet deep or installed between lots or buildings shall be determined on a case-by-case basis, and VBMU reserves the right to require the dedication of easements with widths greater than 15 feet. Water lines shall be installed as close to the center of the easement as possible. B. The Developer shall provide additional easement width beyond the normal water line easement described above for the installation of vaults for control valves, pressure reducing valves, water meters (typically 3-inch and larger), and other underground structures. Dedication of additional easement width or other property dedication shall be determined on a case-by-case basis and as required by VBMU. C. The Developer shall provide a minimum 50-foot by 50-foot (50' x 50') deeded lot for all pump stations and elevated tanks less than 250,000 gallons. The lot shall accommodate a minimum, unobstructed access easement width of 15 feet around the structure for maintenance purposes, coating of structures, etc. The locations and sizes of properties for elevated tanks greater than 250,000 gallons and all ground storage tanks shall be approved on a case-by-case basis. Ownership of the property must be transferred to the VBMU by warranty deed and not merely by the platting of the pump station or tank lot within a larger subdivision. If the deeded property is not continuous with public street right-of-way, the Developer shall also provide a minimum 15-foot wide access easement across private property. Dedication of additional easement width or other property dedication shall be determined on a case-by-case basis and as required by VBMU. D. If undeveloped property exists beyond the limits of the development, additional water easements may be required to be dedicated to VBMU to provide for future service access.

Appears in 1 contract

Sources: Design Standards, Standard Specifications, and Standard Details for Water and Wastewater

PROPERTY DEDICATION. A. The Developer shall provide a 15-foot wide public water line utility easement for all water sewer lines buried up to 7 feet deep. Easement widths required requirements for locations where sewer lines are more than 7 feet deep or installed between lots or buildings shall be determined on a case-by-case basis, and VBMU reserves the right to require the dedication of easements with widths greater than 15 feet. Water lines shall be installed as close to the center of the easement as possible. B. The Developer shall provide additional easement width beyond the normal water line easement described above for the installation of vaults for control valves, pressure reducing valves, water meters (typically 3-inch and larger), and other underground structures. Dedication of additional easement width or other property dedication shall be determined on a case-by-case basis and as by Van Buren Municipal Utilities. All sanitary sewers shall be centered in the easement unless otherwise approved or directed by Van Buren Municipal Utilities. Where sanitary sewers are constructed in the public right-of-way, the easement shall extend the distance outside the right-of-way necessary to provide the required by VBMUeasement width. C. B. The Developer shall provide a minimum 50-foot by 50-foot (50' x 50') of deeded lot for all submersible pump stations and elevated tanks less than 250,000 gallonswith wet ▇▇▇▇▇ up to 20 feet deep. The lot shall accommodate a minimum, unobstructed access easement width of 15 feet around the structure for maintenance purposes, coating of structures, etc. The locations and sizes of properties Lot size requirements for elevated tanks pump stations with wet ▇▇▇▇▇ greater than 250,000 gallons and all ground storage tanks 20 feet deep shall be approved handled on a case-by-case basis. Ownership of the property must be transferred to the VBMU Van Buren Municipal Utilities by warranty deed and not merely by the platting plating of the pump station or tank lot within a larger subdivision. If the deeded property is not continuous with a public street right-of-way, the Developer shall also provide a minimum 15-foot wide access easement across private property. Dedication of additional easement width or other property dedication shall be determined on a case-by-case basis and as required by VBMU. D. C. If undeveloped property exists beyond the limits of the development, additional water sanitary sewer easements may be required to be dedicated to VBMU Van Buren Municipal Utilities to provide for future service access.

Appears in 1 contract

Sources: Design Standards, Standard Specifications, and Standard Details for Water and Wastewater

PROPERTY DEDICATION. A. The Developer shall provide a 15-foot wide public water sewer line utility easement for all water sewer lines buried up to 7 feet deep. Easement widths required requirements for locations where sewer lines are more than 7 feet deep or installed between lots or buildings shall be determined on a case-by-case basis, basis and VBMU reserves the right to require the dedication of easements with widths greater than 15 feetas required by VBMU. Water lines All sanitary sewers shall be installed as close to the center of centered in the easement as possible. B. The Developer unless otherwise approved or directed by VBMU. Where sanitary sewers are constructed in the public right-of-way, the easement shall extend the distance outside the right-of-way necessary to provide additional the required easement width beyond the normal water line easement described above for the installation of vaults for control valves, pressure reducing valves, water meters (typically 3-inch and larger), and other underground structureswidth. Dedication of additional easement width or other property dedication shall be determined on a case-case- by-case basis and as required by VBMU. C. B. The Developer shall provide a minimum 50-foot by 50-foot (50' x 50') of deeded lot for all submersible pump stations and elevated tanks less than 250,000 gallonswith wet ▇▇▇▇▇ up to 20 feet deep. The lot shall accommodate a minimum, unobstructed access easement width of 15 feet around the structure for maintenance purposes, coating of structures, etc. The locations and sizes of properties Lot size requirements for elevated tanks pump stations with wet ▇▇▇▇▇ greater than 250,000 gallons and all ground storage tanks shall 20 feet deep will be approved considered by VBMU on a case-by-case basis. Ownership of the property must be transferred to the VBMU by warranty deed and not merely by the platting of the pump station or tank lot within a larger subdivision. If the deeded property is not continuous with a public street right-right- of-way, the Developer shall also provide a minimum 15-foot wide access easement across private property. Dedication of additional easement width or other property dedication shall be determined on a case-by-case basis and as required by VBMU. D. C. If undeveloped property exists beyond the limits of the development, additional water sanitary sewer easements may be required to be dedicated to VBMU to provide for future service access.

Appears in 1 contract

Sources: Design Standards, Standard Specifications, and Standard Details for Water and Wastewater