Project Substation. EPC Contractor shall design, procure and install the Project Substation located on the Site, which will incorporate Owner’s Transformer. The Project Substation shall generally consist of all civil foundation, structures, circuit breakers, switches, metering and instrumentation, relays and controls, arresters, transformers, control buildings, SCADA, telecommunications and appurtenant facilities and equipment.
Project Substation. A high-voltage substation connected to each Station Unit beginning at the high-voltage terminals of such Station Unit’s step-up transformer.
Project Substation. The Project Substation will be an outdoor air insulated low profile design, single bus configuration located adjacent to the Xxxxxxx Substation, discussed below. It will consist of five 1250A grounding circuit breakers for the collector lines connected to the 34.5/230 kV step-up transformer. These breakers will be rated 38 kV maximum voltage 25 kA interrupting capability. A 34.5 kV disconnect switch will be installed on the 34.5 kV side of the main step-up transformer. The Project Substation circuit breakers, disconnect switches, PTs, CTs, and surge arresters will be connected by a combination of strain buses and rigid buses mounted on porcelain insulators, supported on steel structures. The Project Substation will include circuit breaker current transformers and bus- connected voltage transformers for metering and relaying. A 34.5 kV-120/240V station service transformer will supply power for the station service. All equipment, including fences, will be grounded to a sub-grade grounding system designed to IEEE 80 requirement. The substation area shall be covered with a 4 inch layer of # 2 crushed stone over a 6 inch layer of NYSDOT item 4 and will extend for a distance equal to 5 feet beyond the fence line.

Related to Project Substation

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

Time is Money Join Law Insider Premium to draft better contracts faster.